{"id":11807,"external_id":"plugin_asdk_app_6add46d40f448191905e327e261ec86c","name":"dchub","display_name":"DC Hub","developer":"DC Hub","category":"Data & Analytics","listing_language":"en","listing_language_details":{"method":"cld-0.13.0/listing-v1","reliable":true,"detected_at":"2026-11-09T00:07:27Z","input_sha256":"f1b1e870d6459c686087e9cce1487ed5936753a909f7c465b7773f873d4e5aac","source_fields":["release.description","release.interface.short_description","release.interface.long_description"]},"version":"1.0.1","skill_count":1,"first_seen_at":"2026-11-09T00:00:30.988Z","last_seen_at":"2026-11-09T06:00:26.043Z","last_changed_at":"2026-11-09T00:00:30.988Z","install_count":null,"search_matches":[],"research_summary":null,"research_reviewed_at":null,"metadata":{"canonical_app_id":"asdk_app_6add46d40f448191905e327e261ec86c","connector_id":"asdk_app_6add46d40f448191905e327e261ec86c","created_at":"2026-10-25T19:40:40.986614Z","discoverability":"LISTED","id":"plugin_asdk_app_6add46d40f448191905e327e261ec86c","is_template":false,"is_template_instance":false,"name":"dchub","release":{"app_ids":["asdk_app_6add46d40f448191905e327e261ec86c"],"app_manifest":{"apps":{"dchub":{"id":"asdk_app_6add46d40f448191905e327e261ec86c","required":true}}},"app_templates":[],"description":"Live, dated data for data-center site selection: power, grid, interconnection queues, fiber, risk, markets and deals. 65 read-only tools.","display_name":"DC Hub","id":"pluginrel_9bc8f2a9f5988191887d1d98d5e4be11","interface":{"brand_color":"#7C6CF0","capabilities":["Rank data-center markets by power availability","Read live US grid conditions and interconnection queues","Search data-center facilities","Check site hazard, water and fiber","Look up data-center deals and news"],"category":"Data & Analytics","composer_icon_dark_url":null,"composer_icon_url":"https://files.openai.com/content?id=file_000000008bb481fd9f31930496dfc7f7","default_prompt":"Rank the top 5 US data-center markets by DCPI verdict.","default_prompts":["Rank the top 5 US data-center markets by DCPI verdict.","What is the time to power in ERCOT for a 200 MW data center?","Find operational data centers in Ashburn, Virginia."],"developer_name":"DC Hub","logo_url":"https://files.openai.com/content?id=file_000000008fbc8230899b6f22bc5995dc","logo_url_dark":null,"long_description":"DC Hub is the live data layer for data-center site selection. Ask where a data center can get grid power, how long it takes, and what the grid, gas, fiber and permitting picture looks like.\n\nWhat you can do:\n- Rank and compare markets by the Data Center Power Index (DCPI): a daily BUILD / CAUTION / AVOID verdict with score bands and time to power across 300+ markets.\n- Read live grid conditions for the seven US ISOs (PJM, ERCOT, CAISO, MISO, SPP, NYISO, ISO-NE), plus interconnection queues, retirements and hosting capacity.\n- Look up data-center facilities, planned pipeline projects and operators.\n- Check gas-fired power inputs, energy prices, tax incentives, water stress, hazard and climate risk for a location.\n- Review fiber routes, carriers, subsea cables and peering near a site.\n- Track hyperscaler deals, M&A transactions, permitting and moratorium records, and industry news.\n\nAll 65 tools are read-only lookups: they never change data or your account. Every answer carries an as-of date and a citation line. Some fields may come back as previews; the response marks which fields were withheld.","plugin_category_id":"data & analytics","privacy_policy_url":"https://dchub.cloud/privacy","screenshot_urls":[],"short_description":"Data-center power & grid data","terms_of_service_url":"https://dchub.cloud/terms","website_url":"https://dchub.cloud"},"keywords":["data-center","power","grid","energy","fiber","site-selection"],"onboarding_skill_name":"get-started","requires_local_executor":false,"skills":[{"description":"Start using DC Hub in ChatGPT. Shows what DC Hub can answer about data-center sites, power, grid, fiber and deals, with example questions to try.","interface":{"brand_color":null,"default_prompt":null,"display_name":"get-started","icon_large_url":null,"icon_small_url":null,"iconography":"search","short_description":"Start using DC Hub in ChatGPT. Shows what DC Hub can answer about data-center sites, power, grid, fiber and deals, with example questions to try."},"name":"get-started","plugin_release_skill_id":"pluginrsk_6add54f1803081918908641e7974f775"}],"version":"1.0.1"},"scope":"GLOBAL","status":"ENABLED"},"research":null,"package_metadata":{"name":"dchub","author":{"url":"https://dchub.cloud","name":"DC Hub"},"license":"MIT","sources":[{"path":"plugin.json","sha256":"f4742ef4800b3a7d68fe6a5b07617ad118ef592c819edcb3e4640fa8f162adf2"}],"version":"1.0.1","commerce":false,"homepage":"https://dchub.cloud","keywords":["data-center","power","grid","energy","fiber","site-selection"],"repository":"https://github.com/azmartone67/dchub-mcp-server","artifact_id":188663,"observed_at":"2026-11-09T01:31:26Z","support_url":"https://dchub.cloud/faq","capabilities":["Rank data-center markets by power availability","Read live US grid conditions and interconnection queues","Search data-center facilities","Check site hazard, water and fiber","Look up data-center deals and news"],"field_sources":{"name":0,"author":0,"license":0,"version":0,"commerce":0,"homepage":0,"keywords":0,"repository":0,"support_url":0,"capabilities":0,"release_notes":0,"onboarding_skill":0,"review_case_counts":0,"commerce_description":0},"release_notes":"First release in ChatGPT: 65 read-only tools for data-center site selection, covering power and grid, interconnection queues, markets (DCPI), facilities, fiber, site risk and deals. Every answer carries an as-of date and a citation.","onboarding_skill":"./skills/get-started/SKILL.md","extraction_version":1,"review_case_counts":{"negative":3,"positive":5},"conflicts_or_errors":[],"commerce_description":"This plugin does not sell products or process payments."}}