{"id":21362,"plugin_id":"plugins_6aad979cf8348191812bd2ac0cce6181","kind":"skill","collection_source":null,"comparison_source":null,"observed_at":"2026-09-30T23:16:53.588Z","digest":"21409dddd12e12421835c15f76f40afa6c6a76ab9fdfde91de8132e8b78b60fc","against":null,"payload":{"description":"Coordinate complex property goals across acquisition, renovation, conversion, financing preparation, rental operations, sale, inheritance, and distressed-project recovery. Use when the user has a broad real-estate situation, is unsure which property workflow applies, or needs several property specialties integrated. Do not replace licensed legal, tax, lending, valuation, engineering, architectural, energy, or surveying work.","included_files":[{"relative_path":"agents/openai.yaml","size_in_bytes":258}],"name":"orchestrate-real-estate","skill_md_contents":"---\nname: orchestrate-real-estate\ndescription: Coordinate complex property goals across acquisition, renovation, conversion, financing preparation, rental operations, sale, inheritance, and distressed-project recovery. Use when the user has a broad real-estate situation, is unsure which property workflow applies, or needs several property specialties integrated. Do not replace licensed legal, tax, lending, valuation, engineering, architectural, energy, or surveying work.\n---\n\n# Real Estate OS\n\nRoute a property situation to the smallest relevant set of real-estate workflows and integrate their outputs without hiding uncertainty.\n\n## Workflow\n\n1. Establish jurisdiction, property type, ownership, occupancy, project stage, objective, deadline, liabilities, available cash, decision authority, and supplied evidence.\n2. Separate verified facts, owner statements, estimates, assumptions, missing documents, and matters requiring on-site or professional verification.\n3. Triage immediate safety, structural, weatherproofing, insurance, permit, lender-covenant, contractual, tenant, tax-deadline, and liquidity risks. Do not advise continued occupancy or construction when safety is unresolved.\n4. Route only to applicable specialties: due diligence, document audit, feasibility, construction, cost-to-complete, funding preparation, rental operations, sale preparation, energy, insurance, tax organization, or inheritance.\n5. Maintain one decision register with scenario assumptions, evidence dates, owners, dependencies, professional-review gates, and reversible next actions.\n6. Compare options on cash required, time, risk, value, income, reversibility, and confidence. Never present model output as a guaranteed valuation, loan, rent, permit, or tax result.\n7. Produce a staged action plan and evidence pack; obtain explicit approval before contacting third parties, submitting forms, publishing listings, or changing live records.\n\n## Required output\n\n- Situation map and urgent gates\n- Evidence and document gaps\n- Applicable workflows and why\n- Scenario table with assumptions and confidence\n- 7-, 30-, and 90-day action plan\n- Professional-review queue\n- Decisions that remain with the owner\n\n"},"changes":[],"summary":"First saved snapshot. No earlier version is available for comparison.","summary_kind":"deterministic","summary_metadata":{}}