{"id":29776,"plugin_id":"plugins_6a8b0781ab00819195ee67859b81e9aa","kind":"detail","collection_source":"plugin_api","comparison_source":null,"observed_at":"2026-10-09T00:06:34.159Z","digest":"405e7af3cbe023331a659615a64c8acb81dd8631eedf1e3cf1d6c3cbe9439f48","against":18476,"payload":{"canonical_app_id":null,"connector_id":null,"created_at":"2026-08-23T14:49:32.156192Z","discoverability":"LISTED","id":"plugins_6a8b0781ab00819195ee67859b81e9aa","is_template":false,"name":"wsh-risk-assessment","release":{"app_ids":[],"app_manifest":null,"app_templates":[],"description":"Create, review, implement, and communicate Singapore WSH risk assessments.","display_name":"WSH Risk Assessment","id":"pluginrel_ac1f9fd2d6cc8191b8fe57f852f7a1ca","interface":{"brand_color":null,"capabilities":["Interactive","Write"],"category":"Productivity","composer_icon_dark_url":null,"composer_icon_url":"https://files.openai.com/content?id=file_00000000fe508211bd5274d346ff93b0","default_prompt":"Create a WSH risk assessment for this work activity.","default_prompts":["Create a WSH risk assessment for this work activity.","Review this existing risk assessment and report its gaps.","Turn these risk-control gaps into an implementation plan."],"developer_name":"Goh Keng Beng","logo_url":"https://files.openai.com/content?id=file_000000009c7082118e34015d134c054a","logo_url_dark":null,"long_description":"Supports distinct workflows for creating risk assessments, independently reviewing existing assessments, planning and verifying corrective controls, and communicating approved risk information to workers.","plugin_category_id":"productivity","privacy_policy_url":null,"screenshot_urls":[],"short_description":"Create risk assessments","terms_of_service_url":null,"website_url":null},"keywords":[],"mcp_servers":[],"onboarding_skill_name":null,"requires_local_executor":false,"skills":[{"description":"Create a new workplace safety and health risk assessment aligned with Singapore's WSH Risk Management Code of Practice. Use for task decomposition, hazard and consequence identification, existing-control evaluation, 5x5 risk evaluation, additional-control selection, and projected residual risk. Do not use merely to audit an existing RA or track control implementation.","interface":{"brand_color":null,"default_prompt":null,"display_name":"wsh-risk-assessment","icon_large_url":null,"icon_small_url":null,"iconography":"hierarchy","short_description":"Create a new workplace safety and health risk assessment aligned with Singapore's WSH Risk Management Code of Practice. Use for task decomposition, hazard and consequence identification, existing-control evaluation, 5x5 risk evaluation, additional-control selection, and projected residual risk. Do not use merely to audit an existing RA or track control implementation."},"name":"wsh-risk-assessment","plugin_release_skill_id":"pluginrsk_6a8d41c22ad4819181f31c5231003296"},{"description":"Independently review an existing Singapore WSH risk assessment for omissions, weak causal wording, unsupported ratings, control gaps, duplication, and optimistic residual risk. Use for audit, challenge, or gap assessment; revise the source table only when requested.","interface":{"brand_color":null,"default_prompt":null,"display_name":"wsh-risk-assessment-review","icon_large_url":null,"icon_small_url":null,"iconography":"search","short_description":"Independently review an existing Singapore WSH risk assessment for omissions, weak causal wording, unsupported ratings, control gaps, duplication, and optimistic residual risk. Use for audit, challenge, or gap assessment; revise the source table only when requested."},"name":"wsh-risk-assessment-review","plugin_release_skill_id":"pluginrsk_6a8d41c1b5b08191901e2a72e8c18223"},{"description":"Turn an approved or clearly identified draft WSH risk assessment into audience-appropriate worker briefings, toolbox-talk material, quizzes, or visual-content briefs. Use for communication and comprehension checking, not for creating, approving, or changing risk conclusions.","interface":{"brand_color":null,"default_prompt":null,"display_name":"wsh-risk-communication","icon_large_url":null,"icon_small_url":null,"iconography":"chat","short_description":"Turn an approved or clearly identified draft WSH risk assessment into audience-appropriate worker briefings, toolbox-talk material, quizzes, or visual-content briefs. Use for communication and comprehension checking, not for creating, approving, or changing risk conclusions."},"name":"wsh-risk-communication","plugin_release_skill_id":"pluginrsk_6a8d41c1dba481918c32f3685d2927fa"},{"description":"Convert accepted WSH risk-assessment gaps or recommendations into an implementation and effectiveness-verification plan. Use for hierarchy-of-control selection, owners, deadlines, interim protection, evidence, and residual-risk confirmation; do not treat planned controls as implemented.","interface":{"brand_color":null,"default_prompt":null,"display_name":"wsh-risk-control-planning","icon_large_url":null,"icon_small_url":null,"iconography":"hierarchy","short_description":"Convert accepted WSH risk-assessment gaps or recommendations into an implementation and effectiveness-verification plan. Use for hierarchy-of-control selection, owners, deadlines, interim protection, evidence, and residual-risk confirmation; do not treat planned controls as implemented."},"name":"wsh-risk-control-planning","plugin_release_skill_id":"pluginrsk_6a8d41c1d2408191ba40192364eca5c5"}],"version":"1.0.0"},"scope":"GLOBAL","share_url":"https://chatgpt.com/plugins/plugins_6a8b0781ab00819195ee67859b81e9aa?open_in_app","status":"ENABLED"},"changes":[{"path":"/discoverability","type":"changed","before":"UNLISTED","after":"LISTED"},{"path":"/share_url","type":"changed","before":null,"after":"https://chatgpt.com/plugins/plugins_6a8b0781ab00819195ee67859b81e9aa?open_in_app"}],"summary":"Fields changed: 2. /discoverability, /share_url.","summary_kind":"deterministic","summary_metadata":{}}