← Files Spark PackARCHIVED FILE
plugin.json
5.65 KB · Nov 26, 2026 · 00:16 UTC
{
"$schema": "https://agent-plugins.org/schemas/1.0.0/plugin.schema.json",
"name": "spark-pack",
"version": "1.0.0",
"description": "Spark Pack is a set of tools for UK electricians, called by their own AI assistant on site or in the van.",
"author": {
"name": "Nero Labs (Nero Engine Group Ltd)",
"email": "founder@neroengine.com",
"url": "https://spark-pack.nerolabs.workers.dev/docs"
},
"homepage": "https://spark-pack.nerolabs.workers.dev/docs",
"license": "Proprietary",
"keywords": [
"electrician",
"cable sizing",
"part p",
"eicr",
"bs 7671",
"g98"
],
"extensions": {
"com.openai": {
"interface": {
"displayName": "Spark Pack",
"shortDescription": "Cable sizing for UK sparkies",
"longDescription": "Spark Pack is a set of tools for UK electricians, called by their own AI assistant on site or in the van. Ask it to size a cable and it works out the design current, the breaker, the smallest cable that passes, voltage drop and earth fault loop impedance, and shows every step of the working. It answers whether a job is notifiable under Part P in England or Wales and what to do next, gives the fields an EIC, Minor Works certificate or EICR needs and checks a filled certificate for missing fields and failing readings before it is issued, and says whether solar, batteries, EV chargers or heat pumps fall under G98 or G99 and what the network operator needs. Every answer lists its sources and what the electrician must confirm in BS 7671. No text from BS 7671 is copied: voltage drop and Zs come from physics and datasheet resistances, and current capacity from a cautious model that is clearly marked indicative. No sign-in, and nothing about the user or their jobs is stored.\n\nInformation to help a qualified tradesperson, not a substitute for the regulations or their own judgement.",
"developerName": "Nero Labs",
"category": "Productivity",
"capabilities": [],
"websiteURL": "https://spark-pack.nerolabs.workers.dev/docs",
"supportURL": "https://spark-pack.nerolabs.workers.dev/docs",
"privacyPolicyURL": "https://spark-pack.nerolabs.workers.dev/privacy",
"termsOfServiceURL": "https://spark-pack.nerolabs.workers.dev/terms",
"defaultPrompt": [
"Size the cable for a 9.5 kW shower on an 18 metre run, clipped to the wall, with a 0.35 ohm Ze.",
"I'm adding a socket in a kitchen in Cardiff. Is that notifiable under Part P?",
"Check this EICR before I send it: circuit 3 has an insulation reading of 0.6 megohms and I've marked it satisfactory."
],
"brandColor": "#E80010",
"logo": "./assets/logo.png",
"composerIcon": "./assets/composer-icon.png"
},
"review": {
"test_cases": {
"positive": [
{
"description": "Size a shower circuit",
"prompt": "Size the cable for a 9.5 kW shower on an 18 m run clipped direct.",
"tools_triggered": "size_cable",
"expected_behavior": "Recommends 10 mm2 cable on a 45 A type B breaker, shows the design current (41.3 A), voltage drop and earth fault loop checks with the working, and lists what to confirm in BS 7671."
},
{
"description": "Part P notification in Wales",
"prompt": "Is adding a socket in a kitchen in Cardiff notifiable?",
"tools_triggered": "check_part_p",
"expected_behavior": "Says it is notifiable in Wales because kitchens are still a special location there, and what to do next (self-certify through a competent person scheme or tell building control first)."
},
{
"description": "Minor Works certificate fields",
"prompt": "What fields does a Minor Works certificate need?",
"tools_triggered": "get_certificate_schema",
"expected_behavior": "Returns the Minor Electrical Installation Works Certificate fields as a JSON schema with what each section is for."
},
{
"description": "Solar inverter grid rules",
"prompt": "Can I just install a 3.68 kW solar inverter and tell the network after?",
"tools_triggered": "check_grid_connection",
"expected_behavior": "Says G98 applies: install and commission, then notify the network operator within 28 days, and lists the facts the form needs."
},
{
"description": "Check an EICR before issuing",
"prompt": "Check this EICR: circuit 3 insulation 0.6 megohms, marked satisfactory.",
"tools_triggered": "check_certificate",
"expected_behavior": "Says it is not ready to issue: flags the 0.6 megohm insulation reading as below the 1 megohm minimum at 500 V and lists the missing required fields."
}
],
"negative": [
{
"description": "Out of scope: weather",
"prompt": "What is the weather in Leeds tomorrow?"
},
{
"description": "Out of scope: creative writing",
"prompt": "Write me a poem about electricity."
},
{
"description": "Out of scope: booking a trade",
"prompt": "Book an electrician for me in London."
}
]
},
"demo_recording_url": "https://nerolabs-samples.nerolabs.workers.dev/spark-pack-chatgpt-demo.mp4"
},
"publication": {
"countries": [],
"release_notes": "First release of Spark Pack: tools for UK trades, no sign-in, nothing stored."
},
"apps": "./.app.json"
}
}
}
SHA-256: e2a34954e8ebbab1f15e89e69fee398d3efcd7b97b22f082f11b02d6bb9aa0c5