Pathline Project Planner
Zovo v1.0.0
Critical tasks, slack & CSV
Save this plugin to Following and return to review observed changes. Follow up to 10 plugins free.
Description
From the marketplace listing
Project planning tool for critical path calculations. Provide task durations and finish-to-start dependencies to compute project duration, earliest/latest start and finish offsets, total slack and slack before immediate successors, all critical tasks and connecting edges, and one illustrative longest chain. The interactive widget filters critical tasks and lets you edit a duration; the task schedule downloads as CSV. Multiple parallel critical chains are preserved. Durations use integer thousandth-unit arithmetic. Supports one to forty tasks and at most 160 links. Offsets start at zero; no calendar dates, holidays, resource leveling, lags or deadlines. CSV links expire in about one hour.
Language: English · Automatically detected from descriptions.
Competitor profile
From the developer’s listing and package; capabilities are not independently tested. Package observed Nov 3, 2026.
Declared capabilities
- Interactive
- Read
Declared limitations
- Calendar scheduling belongs to a timeline tool; do not call this tool.
- A probabilistic simulation needs a different model; do not call this tool.
- General advice without task durations is out of scope; do not call this tool.
Review scenarios; not an exhaustive list.
Cost & access
This plugin does not sell products or process payments.
Terms may have changed since this observation.
Starter prompt
Calculate critical path: A 3 days; B 5 after A; C 2 after A; D 1 after B and C.
Keywords
Files & skills
File archives
Skill instructions
critical-path737 Bytes
--- name: critical-path description: Compute project critical paths, earliest and latest offsets, total and free slack, and CSV schedules from explicit task durations and finish-to-start dependencies. --- Call calculate_critical_path with unique task IDs, durations, dependency IDs and a single elapsed-time unit. Inputs can be unsorted. Zero durations are milestones. Use provided durations; do not infer missing estimates. Report project duration, critical tasks and the illustrative longest chain. Explain that offsets start at zero and resources, calendars and lags are not modeled. The widget edits durations and exports the complete schedule. Downloads expire in about one hour. Do not use for calendar scheduling or Gantt charts.
Referenced files: 1 — file references are metadata, not package contents.
Release notes
Initial release with deterministic calculations, interactive editing and downloadable CSV.
Declared in the saved package. Remote tools may change independently.
Package details
Publisher declarations from the archived package. These are separate from our research and the live service's terms.
- Package license
- Proprietary
- Package author
- Zovo
- Keywords
- See keywords
- Declared availability
- No country restrictions declaredDeclared regions; live availability may differ.
- Listing translations
- de-DE, es-ES, fr-FR, ja-JP, pl-PL, pt-BR
- Getting started skill
- ./skills/critical-path/SKILL.md
- Commerce declaration
- Does not support commerceThis does not establish whether access is free or paid.
- Review scenarios
- 5 positive · 3 negativeScenario counts, not test results.
Declared capabilities
- Interactive
- Read
Package observed Nov 3, 2026.
Technical details
- First seen
- Oct 28, 2026 · 12:00 UTC
- Last seen
- Nov 3, 2026 · 18:00 UTC
- Collection status
- Collected
plugin_asdk_app_6ad02ef06340819198d504997d7df5c6
Download plugin data (JSON)