← Plugin catalog
Productivity

Pathline Project Planner

Zovo v1.0.0

Critical tasks, slack & CSV

Full description ↓

View on ChatGPT ↗

Save this plugin to Following and return to review observed changes. Follow up to 10 plugins free.

Description

From the marketplace listing

Project planning tool for critical path calculations. Provide task durations and finish-to-start dependencies to compute project duration, earliest/latest start and finish offsets, total slack and slack before immediate successors, all critical tasks and connecting edges, and one illustrative longest chain. The interactive widget filters critical tasks and lets you edit a duration; the task schedule downloads as CSV. Multiple parallel critical chains are preserved. Durations use integer thousandth-unit arithmetic. Supports one to forty tasks and at most 160 links. Offsets start at zero; no calendar dates, holidays, resource leveling, lags or deadlines. CSV links expire in about one hour.

Language: English · Automatically detected from descriptions.

Competitor profile

From the developer’s listing and package; capabilities are not independently tested. Package observed Nov 3, 2026.

Declared capabilities

  • Interactive
  • Read

Declared limitations

  • Calendar scheduling belongs to a timeline tool; do not call this tool.
  • A probabilistic simulation needs a different model; do not call this tool.
  • General advice without task durations is out of scope; do not call this tool.

Review scenarios; not an exhaustive list.

Cost & access

This plugin does not sell products or process payments.

Terms may have changed since this observation.

Starter prompt

Calculate critical path: A 3 days; B 5 after A; C 2 after A; D 1 after B and C.

View onboarding →

View package source →

Keywords

Files & skills

File archives

Plugin package8 files · 14.6 KBBrowse files →
Skill instructions
critical-path737 Bytes

View saved version →

---
name: critical-path
description: Compute project critical paths, earliest and latest offsets, total and free slack, and CSV schedules from explicit task durations and finish-to-start dependencies.
---
Call calculate_critical_path with unique task IDs, durations, dependency IDs and a single elapsed-time unit. Inputs can be unsorted. Zero durations are milestones. Use provided durations; do not infer missing estimates. Report project duration, critical tasks and the illustrative longest chain. Explain that offsets start at zero and resources, calendars and lags are not modeled. The widget edits durations and exports the complete schedule. Downloads expire in about one hour. Do not use for calendar scheduling or Gantt charts.

Referenced files: 1 — file references are metadata, not package contents.

Release notes

Initial release with deterministic calculations, interactive editing and downloadable CSV.

Declared in the saved package. Remote tools may change independently.

Package details

Publisher declarations from the archived package. These are separate from our research and the live service's terms.

Package license
Proprietary
Package author
Zovo
Keywords
See keywords
Declared availability
No country restrictions declaredDeclared regions; live availability may differ.
Listing translations
de-DE, es-ES, fr-FR, ja-JP, pl-PL, pt-BR
Getting started skill
./skills/critical-path/SKILL.md
Commerce declaration
Does not support commerceThis does not establish whether access is free or paid.
Review scenarios
5 positive · 3 negativeScenario counts, not test results.

Declared capabilities

  • Interactive
  • Read

Package observed Nov 3, 2026.

Technical details
First seen
Oct 28, 2026 · 12:00 UTC
Last seen
Nov 3, 2026 · 18:00 UTC
Collection status
Collected

plugin_asdk_app_6ad02ef06340819198d504997d7df5c6

Download plugin data (JSON)