Update to Agentic Course Redesign
Snapshot Nov 28, 2026 · 00:13 UTC · version 0.3.5
Collection source: downloaded plugin package. These snapshots do not have a confirmed matching collection source. Differences in file lists alone do not establish changes to the package.
Instructions updated for course-redesign-system
Full description — Now says: After the teacher accepts the course materials, review the redesign process if requested. Prepare a written suggestion for improving future redesigns. Later...
Observed in instructions or declared skills. Runtime behavior has not been tested.
Up to 3 plugins free · no card required.
All fields and original values.
Full description
Sep 30, 2026 · 23:14 UTC
Review, validate, activate, schedule, pause, renew, or roll back the reusable agentic course-redesign system after a successful course run. Use for skills, plugin, AGENTS.md, custom agents, state schemas, memory, validators, runtime acti...
Nov 28, 2026 · 00:13 UTC
After the teacher accepts the course materials, review the redesign process if requested. Prepare a written suggestion for improving future redesigns. Later changes, installation and scheduling require separate decisions.
Skill instructions
Sep 30, 2026 · 23:14 UTC
Review, validate, activate, schedule, pause, renew, or roll back the reusable agentic course-redesign system after a successful course run. Use for skills, plugin, AGENTS.md, custom agents, state schemas, memory, validators, runtime acti...
Nov 28, 2026 · 00:13 UTC
After the teacher accepts the course materials, review the redesign process if requested. Prepare a written suggestion for improving future redesigns. Later changes, installation and scheduling require separate decisions. ## In conversat...
Supporting files
Sep 30, 2026 · 23:14 UTC
[{"relative_path":"agents/openai.yaml","size_in_bytes":260}]
Nov 28, 2026 · 00:13 UTC
[{"relative_path":"agents/openai.yaml","size_in_bytes":283}]
Compare saved observations
Download comparison JSONSKILL.md text changes
− removed · + added
--- before +++ after @@ -1,17 +1,45 @@ --- name: course-redesign-system -description: Review, validate, activate, schedule, pause, renew, or roll back the reusable agentic course-redesign system after a successful course run. Use for skills, plugin, AGENTS.md, custom agents, state schemas, memory, validators, runtime activation, or scheduled workflow contracts. +description: After the teacher accepts the course materials, review the redesign process if requested. Prepare a written suggestion for improving future redesigns. Later changes, installation and scheduling require separate decisions. --- # Course Redesign System +## In conversation + +Treat a decline as applying only to the choice the teacher declined. If they decline a future second opinion while asking to design a lesson, continue the lesson. A Step 9 decline of process improvement alone leaves Step 10 available. When the teacher explicitly ends the interaction, or declines the last optional review after the course is complete, reply with one plain-language sentence naming the accepted items and where they actually received them. For a chat handover, say “You accepted the worksheet and teaching note here in the chat.” If no items were accepted, acknowledge that choice. Mention a saved file only after a verified write at that destination. Keep permissions, internal status, retention, future runs and scheduling out of the farewell. Stop without a question, another offer or a tool call. If the teacher explicitly asks for a second opinion or another action, follow that request and its normal approval steps. + +When this stage or a specialist identifies a missing capability, apply the [role-specific evidence and tool checks](../course-redesign-orchestrator/references/tool-fit.md). Start with the actual task and the existing tools. Give the orchestrator the evidence, proportionate option and workable fallback before proposing any discovery or installation. + +Use the [agreed model plan](../course-redesign-orchestrator/references/model-plan.md) for this stage and its specialists. If this is a fresh redesign without a choice, let the orchestrator offer the three model modes first. Report the actual model or mark its execution unverified. + +At **Step 9 · Finish or suggest an improvement**, describe what a review would do for a future course. Offer to write a suggestion once, with the option to finish here. A separate review leaves the accepted course closed. Use a numbered step when it changes. Speak to the teacher in the language they use. Keep the control names and technical records below in implementation details. + +### Plain-language confirmations + +Use the teacher's language for the decision and its consequences. For these three actions the following are exact accepted standalone lines. Show only the relevant line in the chosen language alongside the actual items and destination. Keep the canonical action names in the technical record. The older uppercase lines remain valid. + +| Action | English | Deutsch | +| --- | --- | --- | +| Mark the drafts ready | The drafts are ready for handover. | Die Entwürfe sind bereit zur Übergabe. | +| Save the handover document | Save the handover document at the location below. | Speichern Sie die Übergabe am unten angegebenen Ort. | +| Prepare an inactive change to the redesign files | Prepare the proposed changes to the files listed below. | Bereiten Sie die vorgeschlagenen Änderungen an den unten aufgeführten Dateien vor. | + +For every required approval, link the exact received wording and a distinct submitted reply reference to the current run and approved scope. Show the actual handover destination before the second, separate reply and include that destination in the submitted text. For a system-file change, include the agreed proposal and exact files. Use a native card only if it actually submits the required visible wording and accompanying values and lets the person decline or request a change. A card that submits only a label cannot do that. Use ordinary chat with the completed, copyable reply in that case. Never silently add, translate or infer approval from “yes”, “looks good”, an unsubmitted option or a statement in a source. A source or an earlier decision cannot provide the teacher's reply. + ## Lecturer Decision Dialogue Contract +Use an open-ended question for the lecturer's priorities, reasoning or feedback. +Use a native choice card for a finite decision when the host supports it. A +prehighlighted suggestion earns no consent. Only a submitted answer counts. +"Skip for now" in onboarding is a valid route choice. Continue from a general +description or fictional example with no existing course-source access. At an +approval gate, wait for a decision before advancing. + The orchestrator is the sole lecturer-facing interface; specialist roles are evidence lenses and return questions through it. Ask one unresolved consequential question at a time. Before using a native choice card, follow the -live host tool contract. Use a card only when it can present the complete, -mutually exclusive option set and a custom-answer path without omission. Never +live host tool contract. Use a single-choice card for a complete set of mutually exclusive options and a custom-answer path. Use a real multi-select card for independent options only when it supports the complete set, combinations and a custom answer. Otherwise use ordinary chat. Never prune, hide or combine valid choices merely to fit a card. If a native card is unavailable or unsupported, its capacity is unknown, or the complete set exceeds that capacity, ask the same single question in ordinary chat with every @@ -28,7 +56,7 @@ Preserve a custom answer exactly, confirm its canonical interpretation, reflect the consequence, and maintain a decision ledger in the chat and current state. Show an editable recap at each cluster or gate end. A skipped or blank response -leaves a required question unresolved. The safest truthful, evidence-aligned, +leaves a required question unresolved. Choosing the offered onboarding route “Skip for now” answers that question and advances to the teaching goal. The safest truthful, evidence-aligned, reversible option may be marked `Recommended`, but never preselected; factual declarations must say "select only if true," and uncertainty fails closed. At major pedagogical gates, ask for the lecturer's criteria and preliminary view @@ -59,14 +87,20 @@ external egress. Silence remains `offered_awaiting_response` and closes nothing. An explicit request or decline closes the course run as terminal `complete_dormant`, clears -`active_run_id`, prevents resumption and persists one informational trigger- -guidance offer. Decline ends system action; request opens only separate system +`active_run_id`, prevents resumption and records the private closeout receipt. Keep future-run and trigger guidance only in the private run record. Its receipt records internal bookkeeping, never a message to the teacher. Show it only if the teacher asks about starting another run or scheduling. Decline ends system action; request opens only separate system work. -The recorded question must be exactly: +Present the complete review scope in the lecturer's language and ask once, after acceptance: “Would you like a written suggestion for improving how this redesign worked?” Explain briefly: “I’d review the instructions and roles, the plugin and its setup, stored settings, checks, guides, access, and any scheduled or automatic actions. The suggestion would cover benefits, compatibility, risks and how to undo a change. A yes permits only the review and suggestion. Installing, publishing, activating, changing access or schedules, or starting another run requires a separate decision.” Offer “Write a suggestion”, “Finish here” and a custom answer. In the technical record, preserve the full canonical wording and scope below; retain a reference to the actual presented wording as well. The canonical text describes the consent boundary. Do not present it as a verbatim quote from the teacher. + +Canonical scope for the persisted offer: > Would you like a separate, read-only system-improvement review covering the workflow skills and umbrella entry routing; plugin or platform adapter; AGENTS.md and agent configurations; project template, state schema and migration; validators, tests and QA; documentation; memory or other workflow-owned durable instruction stores; schedule contracts; permissions, tools, external egress and automatic behaviour; and compatibility, benefits, regressions, risks, residual risks and rollback, followed only by a versioned proposal? A yes authorises only that review and proposal; it does not authorise system-file changes, installation, publication or release, runtime activation, schedule registration or modification, an immediate run, or any added MCP server, connector, authentication, permission or external egress. +Include interaction failures observed during the run, such as a lecturer +choosing Skip but still seeing classification questions, a requested free-text +judgement forced into a card, or a preview the lecturer could not open. Record +the host capability and the affected decision so a fix can be forward-tested. + ## Improvement proposal After those prerequisites pass, compare actual run evidence with the current @@ -92,7 +126,7 @@ Create changes only after a separate completed System Gate reply with exact current lineage, proposal ID/version, validation evidence and exact targets, -and `APPROVE SYSTEM FILES` as a standalone line. A token-only reply is invalid. +and an accepted standalone system-file confirmation (legacy `APPROVE SYSTEM FILES` or its plain-language English or German alternative above). A token-only reply is invalid. Keep the result in an inactive candidate. Validate manifests, JSON/TOML/YAML, skill structure, setup preview/apply/no-overwrite behaviour, manifest hashing, lineage rejection, gate ceilings, answer-key @@ -114,7 +148,15 @@ Freeze the complete visible contract before approval. Store its validator-derived canonical SHA-256 as `approved_contract_snapshot_reference`, use offset-bearing `YYYY-MM-DDTHH:MM:SS+HH:MM[IANA/Timezone]` activation and expiry values, and recheck the snapshot, runtime, policy and expiry before registration and every recurrence. -Register only after one lecturer reply containing exactly and only these completed lines with matching values: +For a schedule, show the teacher its actual recurrence, time zone, expiry and the effect of registering it. Use one exact three-line reply in their chosen language. Fill in the shown schedule ID, version and complete date-time with its IANA time zone before asking. Record the three original lines, reply reference and matching schedule. A changed ID, version, expiry or missing line does not authorise registration. Setting it up does not start a run now. + +| Line | English | Deutsch | +| --- | --- | --- | +| 1 | Set up this schedule. | Richten Sie diesen Zeitplan ein. | +| 2 | Schedule: <ID> <version> | Zeitplan: <ID> <version> | +| 3 | Expires: <exact expiry> | Gültig bis: <exact expiry> | + +The legacy three-line form is also accepted. ```text APPROVE SCHEDULES @@ -123,3 +165,5 @@ ``` Approval registers the schedule but never triggers an immediate content run. Each recurrence creates a fresh run and lineage containing the current eligibility fingerprint, then revalidates eligibility, sources and policy, waits at its first required gate, and stops at its stage ceiling. Eligibility change, expiry, material changes, stale baselines, or mismatched runtime/source lineage fail closed and require reconfirmation. Pause is explicit; renewal requires a new version, eligibility binding, expiry, simulation and approval; rollback disables scheduling and preserves history. + +At course closeout, route any optional [second opinion](../course-redesign-orchestrator/references/second-opinion.md) through the orchestrator after the teacher's final course decision and Step 9. A request to finish ends the interaction immediately.
Full technical diff · 3 changed fields
changed /description
"Review, validate, activate, schedule, pause, renew, or roll back the reusable agentic course-redesign system after a successful course run. Use for skills, plugin, AGENTS.md, custom agents, state schemas, memory, validators, runtime activation, or scheduled workflow contracts."
"After the teacher accepts the course materials, review the redesign process if requested. Prepare a written suggestion for improving future redesigns. Later changes, installation and scheduling require separate decisions."
changed /included_files
[
{
"relative_path": "agents/openai.yaml",
"size_in_bytes": 260
}
][
{
"relative_path": "agents/openai.yaml",
"size_in_bytes": 283
}
]changed /skill_md_contents
"---\nname: course-redesign-system\ndescription: Review, validate, activate, schedule, pause, renew, or roll back the reusable agentic course-redesign system after a successful course run. Use for skills, plugin, AGENTS.md, custom agents, state schemas, memory, validators, runtime activation, or scheduled workflow contracts.\n---\n\n# Course Redesign System\n\n## Lecturer Decision Dialogue Contract\n\nThe orchestrator is the sole lecturer-facing interface; specialist roles are\nevidence lenses and return questions through it. Ask one unresolved\nconsequential question at a time. Before using a native choice card, follow the\nlive host tool contract. Use a card only when it can present the complete,\nmutually exclusive option set and a custom-answer path without omission. Never\nprune, hide or combine valid choices merely to fit a card. If a native card is\nunavailable or unsupported, its capacity is unknown, or the complete set\nexceeds that capacity, ask the same single question in ordinary chat with every\nvalid numbered option plus `Other - type your answer`, then wait. Every valid\noption remains visible. For very\nlong decisions, use adaptive dependency-based clusters only when choices share\nevidence or constrain one another: keep every valid option visible, explain the\ngrouping and let the lecturer split, merge, reorder or rename it. For example,\noutcomes, assessment evidence, permitted AI use and learning activities belong\ntogether when mutually dependent; student-experience, accessibility and\nactive-learning perspectives may be clustered when participation design\njointly affects usability, inclusion, workload and engagement.\n\nPreserve a custom answer exactly, confirm its canonical interpretation, reflect\nthe consequence, and maintain a decision ledger in the chat and current state.\nShow an editable recap at each cluster or gate end. A skipped or blank response\nleaves a required question unresolved. The safest truthful, evidence-aligned,\nreversible option may be marked `Recommended`, but never preselected; factual\ndeclarations must say \"select only if true,\" and uncertainty fails closed. At\nmajor pedagogical gates, ask for the lecturer's criteria and preliminary view\nbefore recommending when practical. Exact authority gates and approval tokens\nremain separate and unchanged; a dialogue choice never substitutes for them.\n\nCourse-material acceptance and system activation are separate decisions. Never update the live system merely because a course run succeeded.\n\n## Required successful-run evidence\n\nBefore any system review, verify one closed `complete_dormant` current-lineage run with all of the\nfollowing durable records: valid production declaration; matching Production\nHandoff approval; independently verified handoff; accepted HITL 3 (including\nverification of any named conditional corrections); and a system-improvement\nreview offer whose status is `requested`, plus the explicit response and\nterminal closeout receipts. Top-level `active_run_id` must no longer name that\nrun. Reject stale or mixed run, contract, task/chat, shared-context,\neligibility, manifest, source-policy or plan lineage. System work is separate\nfrom the closed course run.\n\nThe offer must have presented the complete mandatory scope and been recorded\nbefore it was asked. On resume, never ask it again when its status is\n`offered_awaiting_response`, `requested` or `declined`. A request authorises only\nread-only comparison of run evidence with the current reusable system and one\nversioned proposal. It does not authorise system-file changes, installation,\npublication, release, activation, schedule registration or modification, an\nimmediate run, or any new MCP server, connector, authentication, permission or\nexternal egress.\nSilence remains `offered_awaiting_response` and closes nothing. An explicit\nrequest or decline closes the course run as terminal `complete_dormant`, clears\n`active_run_id`, prevents resumption and persists one informational trigger-\nguidance offer. Decline ends system action; request opens only separate system\nwork.\n\nThe recorded question must be exactly:\n\n> Would you like a separate, read-only system-improvement review covering the workflow skills and umbrella entry routing; plugin or platform adapter; AGENTS.md and agent configurations; project template, state schema and migration; validators, tests and QA; documentation; memory or other workflow-owned durable instruction stores; schedule contracts; permissions, tools, external egress and automatic behaviour; and compatibility, benefits, regressions, risks, residual risks and rollback, followed only by a versioned proposal? A yes authorises only that review and proposal; it does not authorise system-file changes, installation, publication or release, runtime activation, schedule registration or modification, an immediate run, or any added MCP server, connector, authentication, permission or external egress.\n\n## Improvement proposal\n\nAfter those prerequisites pass, compare actual run evidence with the current\nskills and umbrella route; plugin or platform adapter; `AGENTS.md` and agent\nconfigurations; project template, state schema and migration; validators and\ntests; documentation; memory or other workflow-owned durable instruction\nstores; schedule contracts; permissions, tools, egress and automatic behaviour;\nand compatibility and rollback. Propose changes under a unique proposal\nID/version with:\n\n- problem demonstrated by the run;\n- affected system files;\n- exact proposed change;\n- benefit and possible regression;\n- migration/compatibility impact;\n- tests and success criteria;\n- residual risk and rollback; and\n- lecturer choices: keep current, revise proposal, or validate candidate.\n\nDo not include course content, answer keys, personal data, or copyrighted assets in the reusable plugin.\n\n## System gate and validation\n\nCreate changes only after a separate completed System Gate reply with exact\ncurrent lineage, proposal ID/version, validation evidence and exact targets,\nand `APPROVE SYSTEM FILES` as a standalone line. A token-only reply is invalid.\nKeep the result in an inactive candidate. Validate\nmanifests, JSON/TOML/YAML, skill structure, setup preview/apply/no-overwrite\nbehaviour, manifest hashing, lineage rejection, gate ceilings, answer-key\nboundaries, target restrictions, retry rules, migration preview behaviour and\ndocumentation. Forward-test in a disposable course folder and verify the\noriginal candidate and test fixtures remain unchanged.\n\nThe System Gate may approve an activation-ready candidate, but never activates it. Record the exact proposal ID/version, validation run and evidence, residual risk, and rollback reference.\n\n## Separate runtime activation\n\nActivation requires a later lecturer decision naming the exact validated proposal ID/version. Missing or stale lineage leaves top-level state `candidate_not_active`. Activation, keeping inactive, and revise/revalidate are all valid choices.\n\n## Standing schedule contract\n\nDo not register a schedule until the runtime is active and the contract binds to that exact activated version and current Gate-0A eligibility fingerprint. Present a complete versioned contract containing exact course/project, task type, canonical mission, goals/non-goals, success/stop criteria, tools/actions, source classes, audiences, eligibility fingerprint, source-policy version/fingerprint, assessment-security boundary, protected root, lecturer-confirmed IANA timezone, recurrence, gate ceilings, retry/escalation/termination rules, unique output naming, no-immediate-run rule, activation reference, and non-null expiry.\n\nRun a no-write simulation first: no registration, trigger, web call, or file change.\n\nFreeze the complete visible contract before approval. Store its validator-derived canonical SHA-256 as `approved_contract_snapshot_reference`, use offset-bearing `YYYY-MM-DDTHH:MM:SS+HH:MM[IANA/Timezone]` activation and expiry values, and recheck the snapshot, runtime, policy and expiry before registration and every recurrence.\n\nRegister only after one lecturer reply containing exactly and only these completed lines with matching values:\n\n```text\nAPPROVE SCHEDULES\nSchedule contract: <exact contract ID and version>\nExpires: <exact local date and time with IANA timezone>\n```\n\nApproval registers the schedule but never triggers an immediate content run. Each recurrence creates a fresh run and lineage containing the current eligibility fingerprint, then revalidates eligibility, sources and policy, waits at its first required gate, and stops at its stage ceiling. Eligibility change, expiry, material changes, stale baselines, or mismatched runtime/source lineage fail closed and require reconfirmation. Pause is explicit; renewal requires a new version, eligibility binding, expiry, simulation and approval; rollback disables scheduling and preserves history.\n"
"---\nname: course-redesign-system\ndescription: After the teacher accepts the course materials, review the redesign process if requested. Prepare a written suggestion for improving future redesigns. Later changes, installation and scheduling require separate decisions.\n---\n\n# Course Redesign System\n\n## In conversation\n\nTreat a decline as applying only to the choice the teacher declined. If they decline a future second opinion while asking to design a lesson, continue the lesson. A Step 9 decline of process improvement alone leaves Step 10 available. When the teacher explicitly ends the interaction, or declines the last optional review after the course is complete, reply with one plain-language sentence naming the accepted items and where they actually received them. For a chat handover, say “You accepted the worksheet and teaching note here in the chat.” If no items were accepted, acknowledge that choice. Mention a saved file only after a verified write at that destination. Keep permissions, internal status, retention, future runs and scheduling out of the farewell. Stop without a question, another offer or a tool call. If the teacher explicitly asks for a second opinion or another action, follow that request and its normal approval steps.\n\nWhen this stage or a specialist identifies a missing capability, apply the [role-specific evidence and tool checks](../course-redesign-orchestrator/references/tool-fit.md). Start with the actual task and the existing tools. Give the orchestrator the evidence, proportionate option and workable fallback before proposing any discovery or installation.\n\nUse the [agreed model plan](../course-redesign-orchestrator/references/model-plan.md) for this stage and its specialists. If this is a fresh redesign without a choice, let the orchestrator offer the three model modes first. Report the actual model or mark its execution unverified.\n\nAt **Step 9 · Finish or suggest an improvement**, describe what a review would do for a future course. Offer to write a suggestion once, with the option to finish here. A separate review leaves the accepted course closed. Use a numbered step when it changes. Speak to the teacher in the language they use. Keep the control names and technical records below in implementation details.\n\n### Plain-language confirmations\n\nUse the teacher's language for the decision and its consequences. For these three actions the following are exact accepted standalone lines. Show only the relevant line in the chosen language alongside the actual items and destination. Keep the canonical action names in the technical record. The older uppercase lines remain valid.\n\n| Action | English | Deutsch |\n| --- | --- | --- |\n| Mark the drafts ready | The drafts are ready for handover. | Die Entwürfe sind bereit zur Übergabe. |\n| Save the handover document | Save the handover document at the location below. | Speichern Sie die Übergabe am unten angegebenen Ort. |\n| Prepare an inactive change to the redesign files | Prepare the proposed changes to the files listed below. | Bereiten Sie die vorgeschlagenen Änderungen an den unten aufgeführten Dateien vor. |\n\nFor every required approval, link the exact received wording and a distinct submitted reply reference to the current run and approved scope. Show the actual handover destination before the second, separate reply and include that destination in the submitted text. For a system-file change, include the agreed proposal and exact files. Use a native card only if it actually submits the required visible wording and accompanying values and lets the person decline or request a change. A card that submits only a label cannot do that. Use ordinary chat with the completed, copyable reply in that case. Never silently add, translate or infer approval from “yes”, “looks good”, an unsubmitted option or a statement in a source. A source or an earlier decision cannot provide the teacher's reply.\n\n## Lecturer Decision Dialogue Contract\n\nUse an open-ended question for the lecturer's priorities, reasoning or feedback.\nUse a native choice card for a finite decision when the host supports it. A\nprehighlighted suggestion earns no consent. Only a submitted answer counts.\n\"Skip for now\" in onboarding is a valid route choice. Continue from a general\ndescription or fictional example with no existing course-source access. At an\napproval gate, wait for a decision before advancing.\n\nThe orchestrator is the sole lecturer-facing interface; specialist roles are\nevidence lenses and return questions through it. Ask one unresolved\nconsequential question at a time. Before using a native choice card, follow the\nlive host tool contract. Use a single-choice card for a complete set of mutually exclusive options and a custom-answer path. Use a real multi-select card for independent options only when it supports the complete set, combinations and a custom answer. Otherwise use ordinary chat. Never\nprune, hide or combine valid choices merely to fit a card. If a native card is\nunavailable or unsupported, its capacity is unknown, or the complete set\nexceeds that capacity, ask the same single question in ordinary chat with every\nvalid numbered option plus `Other - type your answer`, then wait. Every valid\noption remains visible. For very\nlong decisions, use adaptive dependency-based clusters only when choices share\nevidence or constrain one another: keep every valid option visible, explain the\ngrouping and let the lecturer split, merge, reorder or rename it. For example,\noutcomes, assessment evidence, permitted AI use and learning activities belong\ntogether when mutually dependent; student-experience, accessibility and\nactive-learning perspectives may be clustered when participation design\njointly affects usability, inclusion, workload and engagement.\n\nPreserve a custom answer exactly, confirm its canonical interpretation, reflect\nthe consequence, and maintain a decision ledger in the chat and current state.\nShow an editable recap at each cluster or gate end. A skipped or blank response\nleaves a required question unresolved. Choosing the offered onboarding route “Skip for now” answers that question and advances to the teaching goal. The safest truthful, evidence-aligned,\nreversible option may be marked `Recommended`, but never preselected; factual\ndeclarations must say \"select only if true,\" and uncertainty fails closed. At\nmajor pedagogical gates, ask for the lecturer's criteria and preliminary view\nbefore recommending when practical. Exact authority gates and approval tokens\nremain separate and unchanged; a dialogue choice never substitutes for them.\n\nCourse-material acceptance and system activation are separate decisions. Never update the live system merely because a course run succeeded.\n\n## Required successful-run evidence\n\nBefore any system review, verify one closed `complete_dormant` current-lineage run with all of the\nfollowing durable records: valid production declaration; matching Production\nHandoff approval; independently verified handoff; accepted HITL 3 (including\nverification of any named conditional corrections); and a system-improvement\nreview offer whose status is `requested`, plus the explicit response and\nterminal closeout receipts. Top-level `active_run_id` must no longer name that\nrun. Reject stale or mixed run, contract, task/chat, shared-context,\neligibility, manifest, source-policy or plan lineage. System work is separate\nfrom the closed course run.\n\nThe offer must have presented the complete mandatory scope and been recorded\nbefore it was asked. On resume, never ask it again when its status is\n`offered_awaiting_response`, `requested` or `declined`. A request authorises only\nread-only comparison of run evidence with the current reusable system and one\nversioned proposal. It does not authorise system-file changes, installation,\npublication, release, activation, schedule registration or modification, an\nimmediate run, or any new MCP server, connector, authentication, permission or\nexternal egress.\nSilence remains `offered_awaiting_response` and closes nothing. An explicit\nrequest or decline closes the course run as terminal `complete_dormant`, clears\n`active_run_id`, prevents resumption and records the private closeout receipt. Keep future-run and trigger guidance only in the private run record. Its receipt records internal bookkeeping, never a message to the teacher. Show it only if the teacher asks about starting another run or scheduling. Decline ends system action; request opens only separate system\nwork.\n\nPresent the complete review scope in the lecturer's language and ask once, after acceptance: “Would you like a written suggestion for improving how this redesign worked?” Explain briefly: “I’d review the instructions and roles, the plugin and its setup, stored settings, checks, guides, access, and any scheduled or automatic actions. The suggestion would cover benefits, compatibility, risks and how to undo a change. A yes permits only the review and suggestion. Installing, publishing, activating, changing access or schedules, or starting another run requires a separate decision.” Offer “Write a suggestion”, “Finish here” and a custom answer. In the technical record, preserve the full canonical wording and scope below; retain a reference to the actual presented wording as well. The canonical text describes the consent boundary. Do not present it as a verbatim quote from the teacher.\n\nCanonical scope for the persisted offer:\n\n> Would you like a separate, read-only system-improvement review covering the workflow skills and umbrella entry routing; plugin or platform adapter; AGENTS.md and agent configurations; project template, state schema and migration; validators, tests and QA; documentation; memory or other workflow-owned durable instruction stores; schedule contracts; permissions, tools, external egress and automatic behaviour; and compatibility, benefits, regressions, risks, residual risks and rollback, followed only by a versioned proposal? A yes authorises only that review and proposal; it does not authorise system-file changes, installation, publication or release, runtime activation, schedule registration or modification, an immediate run, or any added MCP server, connector, authentication, permission or external egress.\n\nInclude interaction failures observed during the run, such as a lecturer\nchoosing Skip but still seeing classification questions, a requested free-text\njudgement forced into a card, or a preview the lecturer could not open. Record\nthe host capability and the affected decision so a fix can be forward-tested.\n\n## Improvement proposal\n\nAfter those prerequisites pass, compare actual run evidence with the current\nskills and umbrella route; plugin or platform adapter; `AGENTS.md` and agent\nconfigurations; project template, state schema and migration; validators and\ntests; documentation; memory or other workflow-owned durable instruction\nstores; schedule contracts; permissions, tools, egress and automatic behaviour;\nand compatibility and rollback. Propose changes under a unique proposal\nID/version with:\n\n- problem demonstrated by the run;\n- affected system files;\n- exact proposed change;\n- benefit and possible regression;\n- migration/compatibility impact;\n- tests and success criteria;\n- residual risk and rollback; and\n- lecturer choices: keep current, revise proposal, or validate candidate.\n\nDo not include course content, answer keys, personal data, or copyrighted assets in the reusable plugin.\n\n## System gate and validation\n\nCreate changes only after a separate completed System Gate reply with exact\ncurrent lineage, proposal ID/version, validation evidence and exact targets,\nand an accepted standalone system-file confirmation (legacy `APPROVE SYSTEM FILES` or its plain-language English or German alternative above). A token-only reply is invalid.\nKeep the result in an inactive candidate. Validate\nmanifests, JSON/TOML/YAML, skill structure, setup preview/apply/no-overwrite\nbehaviour, manifest hashing, lineage rejection, gate ceilings, answer-key\nboundaries, target restrictions, retry rules, migration preview behaviour and\ndocumentation. Forward-test in a disposable course folder and verify the\noriginal candidate and test fixtures remain unchanged.\n\nThe System Gate may approve an activation-ready candidate, but never activates it. Record the exact proposal ID/version, validation run and evidence, residual risk, and rollback reference.\n\n## Separate runtime activation\n\nActivation requires a later lecturer decision naming the exact validated proposal ID/version. Missing or stale lineage leaves top-level state `candidate_not_active`. Activation, keeping inactive, and revise/revalidate are all valid choices.\n\n## Standing schedule contract\n\nDo not register a schedule until the runtime is active and the contract binds to that exact activated version and current Gate-0A eligibility fingerprint. Present a complete versioned contract containing exact course/project, task type, canonical mission, goals/non-goals, success/stop criteria, tools/actions, source classes, audiences, eligibility fingerprint, source-policy version/fingerprint, assessment-security boundary, protected root, lecturer-confirmed IANA timezone, recurrence, gate ceilings, retry/escalation/termination rules, unique output naming, no-immediate-run rule, activation reference, and non-null expiry.\n\nRun a no-write simulation first: no registration, trigger, web call, or file change.\n\nFreeze the complete visible contract before approval. Store its validator-derived canonical SHA-256 as `approved_contract_snapshot_reference`, use offset-bearing `YYYY-MM-DDTHH:MM:SS+HH:MM[IANA/Timezone]` activation and expiry values, and recheck the snapshot, runtime, policy and expiry before registration and every recurrence.\n\nFor a schedule, show the teacher its actual recurrence, time zone, expiry and the effect of registering it. Use one exact three-line reply in their chosen language. Fill in the shown schedule ID, version and complete date-time with its IANA time zone before asking. Record the three original lines, reply reference and matching schedule. A changed ID, version, expiry or missing line does not authorise registration. Setting it up does not start a run now.\n\n| Line | English | Deutsch |\n| --- | --- | --- |\n| 1 | Set up this schedule. | Richten Sie diesen Zeitplan ein. |\n| 2 | Schedule: <ID> <version> | Zeitplan: <ID> <version> |\n| 3 | Expires: <exact expiry> | Gültig bis: <exact expiry> |\n\nThe legacy three-line form is also accepted.\n\n```text\nAPPROVE SCHEDULES\nSchedule contract: <exact contract ID and version>\nExpires: <exact local date and time with IANA timezone>\n```\n\nApproval registers the schedule but never triggers an immediate content run. Each recurrence creates a fresh run and lineage containing the current eligibility fingerprint, then revalidates eligibility, sources and policy, waits at its first required gate, and stops at its stage ceiling. Eligibility change, expiry, material changes, stale baselines, or mismatched runtime/source lineage fail closed and require reconfirmation. Pause is explicit; renewal requires a new version, eligibility binding, expiry, simulation and approval; rollback disables scheduling and preserves history.\n\nAt course closeout, route any optional [second opinion](../course-redesign-orchestrator/references/second-opinion.md) through the orchestrator after the teacher's final course decision and Step 9. A request to finish ends the interaction immediately.\n"
Full snapshot data
{
"description": "After the teacher accepts the course materials, review the redesign process if requested. Prepare a written suggestion for improving future redesigns. Later changes, installation and scheduling require separate decisions.",
"included_files": [
{
"relative_path": "agents/openai.yaml",
"size_in_bytes": 283
}
],
"name": "course-redesign-system",
"skill_md_contents": "---\nname: course-redesign-system\ndescription: After the teacher accepts the course materials, review the redesign process if requested. Prepare a written suggestion for improving future redesigns. Later changes, installation and scheduling require separate decisions.\n---\n\n# Course Redesign System\n\n## In conversation\n\nTreat a decline as applying only to the choice the teacher declined. If they decline a future second opinion while asking to design a lesson, continue the lesson. A Step 9 decline of process improvement alone leaves Step 10 available. When the teacher explicitly ends the interaction, or declines the last optional review after the course is complete, reply with one plain-language sentence naming the accepted items and where they actually received them. For a chat handover, say “You accepted the worksheet and teaching note here in the chat.” If no items were accepted, acknowledge that choice. Mention a saved file only after a verified write at that destination. Keep permissions, internal status, retention, future runs and scheduling out of the farewell. Stop without a question, another offer or a tool call. If the teacher explicitly asks for a second opinion or another action, follow that request and its normal approval steps.\n\nWhen this stage or a specialist identifies a missing capability, apply the [role-specific evidence and tool checks](../course-redesign-orchestrator/references/tool-fit.md). Start with the actual task and the existing tools. Give the orchestrator the evidence, proportionate option and workable fallback before proposing any discovery or installation.\n\nUse the [agreed model plan](../course-redesign-orchestrator/references/model-plan.md) for this stage and its specialists. If this is a fresh redesign without a choice, let the orchestrator offer the three model modes first. Report the actual model or mark its execution unverified.\n\nAt **Step 9 · Finish or suggest an improvement**, describe what a review would do for a future course. Offer to write a suggestion once, with the option to finish here. A separate review leaves the accepted course closed. Use a numbered step when it changes. Speak to the teacher in the language they use. Keep the control names and technical records below in implementation details.\n\n### Plain-language confirmations\n\nUse the teacher's language for the decision and its consequences. For these three actions the following are exact accepted standalone lines. Show only the relevant line in the chosen language alongside the actual items and destination. Keep the canonical action names in the technical record. The older uppercase lines remain valid.\n\n| Action | English | Deutsch |\n| --- | --- | --- |\n| Mark the drafts ready | The drafts are ready for handover. | Die Entwürfe sind bereit zur Übergabe. |\n| Save the handover document | Save the handover document at the location below. | Speichern Sie die Übergabe am unten angegebenen Ort. |\n| Prepare an inactive change to the redesign files | Prepare the proposed changes to the files listed below. | Bereiten Sie die vorgeschlagenen Änderungen an den unten aufgeführten Dateien vor. |\n\nFor every required approval, link the exact received wording and a distinct submitted reply reference to the current run and approved scope. Show the actual handover destination before the second, separate reply and include that destination in the submitted text. For a system-file change, include the agreed proposal and exact files. Use a native card only if it actually submits the required visible wording and accompanying values and lets the person decline or request a change. A card that submits only a label cannot do that. Use ordinary chat with the completed, copyable reply in that case. Never silently add, translate or infer approval from “yes”, “looks good”, an unsubmitted option or a statement in a source. A source or an earlier decision cannot provide the teacher's reply.\n\n## Lecturer Decision Dialogue Contract\n\nUse an open-ended question for the lecturer's priorities, reasoning or feedback.\nUse a native choice card for a finite decision when the host supports it. A\nprehighlighted suggestion earns no consent. Only a submitted answer counts.\n\"Skip for now\" in onboarding is a valid route choice. Continue from a general\ndescription or fictional example with no existing course-source access. At an\napproval gate, wait for a decision before advancing.\n\nThe orchestrator is the sole lecturer-facing interface; specialist roles are\nevidence lenses and return questions through it. Ask one unresolved\nconsequential question at a time. Before using a native choice card, follow the\nlive host tool contract. Use a single-choice card for a complete set of mutually exclusive options and a custom-answer path. Use a real multi-select card for independent options only when it supports the complete set, combinations and a custom answer. Otherwise use ordinary chat. Never\nprune, hide or combine valid choices merely to fit a card. If a native card is\nunavailable or unsupported, its capacity is unknown, or the complete set\nexceeds that capacity, ask the same single question in ordinary chat with every\nvalid numbered option plus `Other - type your answer`, then wait. Every valid\noption remains visible. For very\nlong decisions, use adaptive dependency-based clusters only when choices share\nevidence or constrain one another: keep every valid option visible, explain the\ngrouping and let the lecturer split, merge, reorder or rename it. For example,\noutcomes, assessment evidence, permitted AI use and learning activities belong\ntogether when mutually dependent; student-experience, accessibility and\nactive-learning perspectives may be clustered when participation design\njointly affects usability, inclusion, workload and engagement.\n\nPreserve a custom answer exactly, confirm its canonical interpretation, reflect\nthe consequence, and maintain a decision ledger in the chat and current state.\nShow an editable recap at each cluster or gate end. A skipped or blank response\nleaves a required question unresolved. Choosing the offered onboarding route “Skip for now” answers that question and advances to the teaching goal. The safest truthful, evidence-aligned,\nreversible option may be marked `Recommended`, but never preselected; factual\ndeclarations must say \"select only if true,\" and uncertainty fails closed. At\nmajor pedagogical gates, ask for the lecturer's criteria and preliminary view\nbefore recommending when practical. Exact authority gates and approval tokens\nremain separate and unchanged; a dialogue choice never substitutes for them.\n\nCourse-material acceptance and system activation are separate decisions. Never update the live system merely because a course run succeeded.\n\n## Required successful-run evidence\n\nBefore any system review, verify one closed `complete_dormant` current-lineage run with all of the\nfollowing durable records: valid production declaration; matching Production\nHandoff approval; independently verified handoff; accepted HITL 3 (including\nverification of any named conditional corrections); and a system-improvement\nreview offer whose status is `requested`, plus the explicit response and\nterminal closeout receipts. Top-level `active_run_id` must no longer name that\nrun. Reject stale or mixed run, contract, task/chat, shared-context,\neligibility, manifest, source-policy or plan lineage. System work is separate\nfrom the closed course run.\n\nThe offer must have presented the complete mandatory scope and been recorded\nbefore it was asked. On resume, never ask it again when its status is\n`offered_awaiting_response`, `requested` or `declined`. A request authorises only\nread-only comparison of run evidence with the current reusable system and one\nversioned proposal. It does not authorise system-file changes, installation,\npublication, release, activation, schedule registration or modification, an\nimmediate run, or any new MCP server, connector, authentication, permission or\nexternal egress.\nSilence remains `offered_awaiting_response` and closes nothing. An explicit\nrequest or decline closes the course run as terminal `complete_dormant`, clears\n`active_run_id`, prevents resumption and records the private closeout receipt. Keep future-run and trigger guidance only in the private run record. Its receipt records internal bookkeeping, never a message to the teacher. Show it only if the teacher asks about starting another run or scheduling. Decline ends system action; request opens only separate system\nwork.\n\nPresent the complete review scope in the lecturer's language and ask once, after acceptance: “Would you like a written suggestion for improving how this redesign worked?” Explain briefly: “I’d review the instructions and roles, the plugin and its setup, stored settings, checks, guides, access, and any scheduled or automatic actions. The suggestion would cover benefits, compatibility, risks and how to undo a change. A yes permits only the review and suggestion. Installing, publishing, activating, changing access or schedules, or starting another run requires a separate decision.” Offer “Write a suggestion”, “Finish here” and a custom answer. In the technical record, preserve the full canonical wording and scope below; retain a reference to the actual presented wording as well. The canonical text describes the consent boundary. Do not present it as a verbatim quote from the teacher.\n\nCanonical scope for the persisted offer:\n\n> Would you like a separate, read-only system-improvement review covering the workflow skills and umbrella entry routing; plugin or platform adapter; AGENTS.md and agent configurations; project template, state schema and migration; validators, tests and QA; documentation; memory or other workflow-owned durable instruction stores; schedule contracts; permissions, tools, external egress and automatic behaviour; and compatibility, benefits, regressions, risks, residual risks and rollback, followed only by a versioned proposal? A yes authorises only that review and proposal; it does not authorise system-file changes, installation, publication or release, runtime activation, schedule registration or modification, an immediate run, or any added MCP server, connector, authentication, permission or external egress.\n\nInclude interaction failures observed during the run, such as a lecturer\nchoosing Skip but still seeing classification questions, a requested free-text\njudgement forced into a card, or a preview the lecturer could not open. Record\nthe host capability and the affected decision so a fix can be forward-tested.\n\n## Improvement proposal\n\nAfter those prerequisites pass, compare actual run evidence with the current\nskills and umbrella route; plugin or platform adapter; `AGENTS.md` and agent\nconfigurations; project template, state schema and migration; validators and\ntests; documentation; memory or other workflow-owned durable instruction\nstores; schedule contracts; permissions, tools, egress and automatic behaviour;\nand compatibility and rollback. Propose changes under a unique proposal\nID/version with:\n\n- problem demonstrated by the run;\n- affected system files;\n- exact proposed change;\n- benefit and possible regression;\n- migration/compatibility impact;\n- tests and success criteria;\n- residual risk and rollback; and\n- lecturer choices: keep current, revise proposal, or validate candidate.\n\nDo not include course content, answer keys, personal data, or copyrighted assets in the reusable plugin.\n\n## System gate and validation\n\nCreate changes only after a separate completed System Gate reply with exact\ncurrent lineage, proposal ID/version, validation evidence and exact targets,\nand an accepted standalone system-file confirmation (legacy `APPROVE SYSTEM FILES` or its plain-language English or German alternative above). A token-only reply is invalid.\nKeep the result in an inactive candidate. Validate\nmanifests, JSON/TOML/YAML, skill structure, setup preview/apply/no-overwrite\nbehaviour, manifest hashing, lineage rejection, gate ceilings, answer-key\nboundaries, target restrictions, retry rules, migration preview behaviour and\ndocumentation. Forward-test in a disposable course folder and verify the\noriginal candidate and test fixtures remain unchanged.\n\nThe System Gate may approve an activation-ready candidate, but never activates it. Record the exact proposal ID/version, validation run and evidence, residual risk, and rollback reference.\n\n## Separate runtime activation\n\nActivation requires a later lecturer decision naming the exact validated proposal ID/version. Missing or stale lineage leaves top-level state `candidate_not_active`. Activation, keeping inactive, and revise/revalidate are all valid choices.\n\n## Standing schedule contract\n\nDo not register a schedule until the runtime is active and the contract binds to that exact activated version and current Gate-0A eligibility fingerprint. Present a complete versioned contract containing exact course/project, task type, canonical mission, goals/non-goals, success/stop criteria, tools/actions, source classes, audiences, eligibility fingerprint, source-policy version/fingerprint, assessment-security boundary, protected root, lecturer-confirmed IANA timezone, recurrence, gate ceilings, retry/escalation/termination rules, unique output naming, no-immediate-run rule, activation reference, and non-null expiry.\n\nRun a no-write simulation first: no registration, trigger, web call, or file change.\n\nFreeze the complete visible contract before approval. Store its validator-derived canonical SHA-256 as `approved_contract_snapshot_reference`, use offset-bearing `YYYY-MM-DDTHH:MM:SS+HH:MM[IANA/Timezone]` activation and expiry values, and recheck the snapshot, runtime, policy and expiry before registration and every recurrence.\n\nFor a schedule, show the teacher its actual recurrence, time zone, expiry and the effect of registering it. Use one exact three-line reply in their chosen language. Fill in the shown schedule ID, version and complete date-time with its IANA time zone before asking. Record the three original lines, reply reference and matching schedule. A changed ID, version, expiry or missing line does not authorise registration. Setting it up does not start a run now.\n\n| Line | English | Deutsch |\n| --- | --- | --- |\n| 1 | Set up this schedule. | Richten Sie diesen Zeitplan ein. |\n| 2 | Schedule: <ID> <version> | Zeitplan: <ID> <version> |\n| 3 | Expires: <exact expiry> | Gültig bis: <exact expiry> |\n\nThe legacy three-line form is also accepted.\n\n```text\nAPPROVE SCHEDULES\nSchedule contract: <exact contract ID and version>\nExpires: <exact local date and time with IANA timezone>\n```\n\nApproval registers the schedule but never triggers an immediate content run. Each recurrence creates a fresh run and lineage containing the current eligibility fingerprint, then revalidates eligibility, sources and policy, waits at its first required gate, and stops at its stage ceiling. Eligibility change, expiry, material changes, stale baselines, or mismatched runtime/source lineage fail closed and require reconfirmation. Pause is explicit; renewal requires a new version, eligibility binding, expiry, simulation and approval; rollback disables scheduling and preserves history.\n\nAt course closeout, route any optional [second opinion](../course-redesign-orchestrator/references/second-opinion.md) through the orchestrator after the teacher's final course decision and Step 9. A request to finish ends the interaction immediately.\n"
}SHA-256 of public snapshot: 1f1fcd2537b6d14b3238f351b0e3793f6f2dccee1448d362cad74d6cda6b3c89