← Claus Argos Skill OSCONTENT HISTORYWHAT CHANGED · RULE-BASED ANALYSIS
Update to Claus Argos Skill OS
Snapshot Sep 30, 2026 · 23:14 UTC · version 1.16.0
Collection source: not recorded for this historical snapshot.
First saved snapshot
No earlier snapshot is available to establish a change.
Compare saved observations
Download comparison JSONFull technical diff · 0 changed fields
Full snapshot data
{
"name": "optimize-renovation-scope",
"description": "Prioritize a property renovation scope by safety, legal or lender requirements, asset protection, usability, income enablement, value contribution, sequencing, and reversibility. Use when budget is constrained or scope must be reduced. Do not remove professionally required work or infer compliance from cost pressure.",
"included_files": [
{
"relative_path": "agents/openai.yaml",
"size_in_bytes": 245
}
],
"skill_md_contents": "---\nname: optimize-renovation-scope\ndescription: Prioritize a property renovation scope by safety, legal or lender requirements, asset protection, usability, income enablement, value contribution, sequencing, and reversibility. Use when budget is constrained or scope must be reduced. Do not remove professionally required work or infer compliance from cost pressure.\n---\n\n# Renovation Scope Optimizer\n\n## Workflow\n\n1. Establish the objective: safe holding, occupancy, first rentable unit, full rental launch, refinance readiness, or sale readiness.\n2. Classify each item as immediate safety, weatherproofing or deterioration prevention, mandatory approval or contract requirement, functional completion, income-enabling, value-enhancing, cosmetic, optional, or unknown.\n3. Record dependency, minimum viable specification, evidence source, cost range, lead time, rework risk, and consequences of deferral.\n4. Protect structural, fire, water, electrical, gas, sanitation, accessibility, energy, insurance, and permit-related requirements from unqualified cost cutting.\n5. Build full, reduced, phased, and secure-and-pause scopes. Show which savings are real versus merely deferred and which create downstream rework.\n6. Require owner and appropriate professional approval for exclusions that affect safety, compliance, warranty, finance, insurance, or future use.\n\n## Required output\n\n- Prioritized scope register\n- Protected and deferrable items\n- Full/reduced/phased comparisons\n- Cash timing and rework consequences\n- Approval gates and excluded assumptions\n- Recommended next decision, not an unauthorized scope change\n\n"
}SHA-256: b6eb87655d16c204f8290fc8e7a2becf3135dbb3f6b30e318b0a9f9967b35016