← Claus Argos Skill OSCONTENT HISTORYWHAT CHANGED · RULE-BASED ANALYSIS
Update to Claus Argos Skill OS
Snapshot Sep 30, 2026 · 23:14 UTC · version 1.16.0
Collection source: not recorded for this historical snapshot.
First saved snapshot
No earlier snapshot is available to establish a change.
Compare saved observations
Download comparison JSONFull technical diff · 0 changed fields
Full snapshot data
{
"description": "Turn a defined property renovation or refurbishment objective into phased work packages, dependencies, responsibilities, inspections, approvals, and acceptance gates. Use for renovation planning after scope and condition are sufficiently known. Do not perform structural, architectural, engineering, code, or permit determinations.",
"included_files": [
{
"relative_path": "agents/openai.yaml",
"size_in_bytes": 258
}
],
"name": "plan-property-renovations",
"skill_md_contents": "---\nname: plan-property-renovations\ndescription: Turn a defined property renovation or refurbishment objective into phased work packages, dependencies, responsibilities, inspections, approvals, and acceptance gates. Use for renovation planning after scope and condition are sufficiently known. Do not perform structural, architectural, engineering, code, or permit determinations.\n---\n\n# Property Renovation Planner\n\n## Workflow\n\n1. Capture the existing condition, target condition, occupied areas, protected elements, drawings, surveys, permits, budget, deadlines, procurement constraints, and professional responsibilities.\n2. Divide the scope into enabling works, safety and weatherproofing, demolition, structure, envelope, building services, partitions, finishes, commissioning, documentation, and handover as applicable.\n3. Map dependencies, long-lead items, access constraints, shutdowns, temporary works, inspections, decision deadlines, and owner-supplied items.\n4. Define each work package with scope boundary, prerequisites, responsible party, inputs, exclusions, inspection evidence, completion criteria, and downstream handoff.\n5. Identify uncertain conditions requiring opening-up work or professional assessment before fixed commitments.\n6. Create baseline schedule, change-control rule, issue log, and staged quality gates. Never authorize work, select a contractor, or approve a change without the owner's instruction.\n\n## Required output\n\n- Scope and assumption register\n- Work-breakdown structure\n- Dependency and critical-path map\n- Procurement and inspection schedule\n- Responsibility matrix\n- Change-control and acceptance plan\n- Unresolved professional-review items\n\n"
}SHA-256 of public snapshot: f61d20152073cfa68ddda3ad3e72f9abca17cd417f2cdb51f4d318ed50e78f64