← Argovance Skill OSCONTENT HISTORY

Update to Argovance Skill OS

Snapshot Sep 30, 2026 · 23:16 UTC · version 1.1.0

Collection source: not recorded for this historical snapshot.

WHAT CHANGED · RULE-BASED ANALYSIS

First saved snapshot

No earlier snapshot is available to establish a change.

Compare saved observations

Download comparison JSON
Full technical diff · 0 changed fields
Full snapshot data
{
  "description": "Build a jurisdiction- and project-specific checklist of potential property permissions, consultations, submissions, inspections, certificates, dependencies, and evidence to verify. Use for permit and compliance planning. Do not determine that approval is or is not required, interpret law conclusively, submit applications, or certify compliance.",
  "included_files": [
    {
      "relative_path": "agents/openai.yaml",
      "size_in_bytes": 257
    }
  ],
  "name": "build-property-permit-checklists",
  "skill_md_contents": "---\nname: build-property-permit-checklists\ndescription: Build a jurisdiction- and project-specific checklist of potential property permissions, consultations, submissions, inspections, certificates, dependencies, and evidence to verify. Use for permit and compliance planning. Do not determine that approval is or is not required, interpret law conclusively, submit applications, or certify compliance.\n---\n\n# Property Permit and Compliance Checklist Builder\n\n## Workflow\n\n1. Define exact jurisdiction, authority, property, current and proposed use, works, occupancy, tenure, protected status, site constraints, and project stage.\n2. Research current official authority and statutory sources; record access date, effective date, scope, and unresolved interpretation.\n3. Build a verification matrix for planning or zoning, building control or code, fire, accessibility, heritage, environmental or habitat, demolition, trees, highways, parking, utilities, drainage, signage, licensing, occupancy, energy, and inspections as applicable.\n4. Identify prerequisite surveys, drawings, calculations, ownership consents, notices, consultations, fees, lead times, conditions, expiry, inspections, and completion evidence.\n5. Separate confirmed requirement, likely applicability requiring confirmation, not applicable with evidence, and unknown.\n6. Route legal interpretation and design compliance to qualified local professionals or authorities; do not treat the checklist as permission to proceed.\n\n## Required output\n\n- Project and jurisdiction scope\n- Permission and evidence matrix\n- Authority and professional contacts to verify\n- Dependency and submission sequence\n- Decision deadlines and expiry risks\n- Unknowns and no-work gates\n\n"
}

SHA-256 of public snapshot: 6789bddd3d985c595fedd0b91e0df57443fb655bb035636277e330cd1baa8588