← Argovance Skill OSCONTENT HISTORY

Update to Argovance Skill OS

Snapshot Sep 30, 2026 · 23:16 UTC · version 1.1.0

Collection source: not recorded for this historical snapshot.

WHAT CHANGED · RULE-BASED ANALYSIS

First saved snapshot

No earlier snapshot is available to establish a change.

Compare saved observations

Download comparison JSON
Full technical diff · 0 changed fields
Full snapshot data
{
  "description": "Build or audit a property construction schedule with dependencies, milestones, constraints, inspections, decision dates, delay effects, and recovery options. Use for programme control after scope is defined. Do not certify delay entitlement, direct site work, or replace professional construction management.",
  "included_files": [
    {
      "relative_path": "agents/openai.yaml",
      "size_in_bytes": 265
    }
  ],
  "name": "control-construction-schedules",
  "skill_md_contents": "---\nname: control-construction-schedules\ndescription: Build or audit a property construction schedule with dependencies, milestones, constraints, inspections, decision dates, delay effects, and recovery options. Use for programme control after scope is defined. Do not certify delay entitlement, direct site work, or replace professional construction management.\n---\n\n# Construction Schedule Controller\n\n## Workflow\n\n1. Define schedule data date, calendars, scope version, work areas, occupancy constraints, contractual milestones, and evidence quality.\n2. Link activities through genuine dependencies; identify permits, design decisions, procurement, access, utilities, inspections, drying, curing, commissioning, and handover requirements.\n3. Mark critical and near-critical paths, float assumptions, long-lead items, interfaces, and owner decisions.\n4. Compare baseline, current forecast, actual progress, and claimed progress. Keep unsupported percentages separate from evidenced completion.\n5. Model delay consequences for preliminaries, finance carry, rent or sale timing, seasonal exposure, and downstream trades.\n6. Present recovery choices with cost, risk, resource, quality, and approval implications; never assume acceleration is feasible or free.\n\n## Required output\n\n- Baseline/current milestone table\n- Critical-path and blocker map\n- Delay and cost-impact register\n- Two- and six-week lookahead\n- Decision and procurement deadlines\n- Recovery options and unresolved evidence\n\n"
}

SHA-256 of public snapshot: 8a8361ac84f6db6e5100cd3ba58da46cb20a9eb569195f295a7ebf8537872e22