← Files Argovance Skill OSARCHIVED FILE
skills/execute-premium-projects/references/quality-gates.md
2.82 KB · Oct 2, 2026 · 00:34 UTC
# Quality Gates Select only gates relevant to the work. A gate passes only with observable evidence or a clearly disclosed professional judgment. ## Universal gates - **Correctness:** Does the result meet explicit requirements and acceptance criteria? - **User value:** Does it solve the intended problem for the intended user? - **Coherence:** Do parts support one another without contradictions? - **Precision:** Are claims, instructions, interfaces, and outputs specific enough to use? - **Sustainability:** Is the result maintainable and appropriate for its expected lifetime? - **Risk:** Are material failure modes controlled, detectable, and recoverable? - **Scope:** Was the requested outcome completed without unrelated expansion? ## Strategy and business - evidence versus assumptions; - customer and problem fit; - differentiation and alternatives; - economics and resource realism; - operational feasibility; - legal or regulatory review boundary; - kill, pivot, and scale criteria; - long-term strategic fit. ## Software and technical systems - functional and integration tests; - architecture and dependency direction; - security, privacy, and secrets; - data integrity, migrations, and rollback; - performance and scalability proportional to need; - failure handling, observability, and recovery; - accessibility and compatibility where relevant; - maintainability and documentation; - regression against existing behavior. ## Product and UX - target user and job clarity; - information architecture and task flow; - friction, feedback, states, and error recovery; - accessibility and mobile behavior; - trust, proof, and conversion integrity; - consistency with the broader product; - evidence that the feature is necessary. ## Design and creative work - concept strength and distinctiveness; - audience, brand, and context fit; - hierarchy, composition, consistency, and craft; - usability and accessibility; - production feasibility and asset rights; - emotional effect without gratuitous spectacle; - continuity across formats and states. ## Research and analysis - source quality and freshness; - claim-to-source traceability; - method fit and reproducibility; - uncertainty and limitations; - alternative explanations; - false precision, selection bias, and unsupported causality; - distinction between fact, inference, and recommendation. ## Planning and operations - clear owners and decision rights; - dependencies and critical path; - realistic capacity and sequencing; - measurable completion and quality criteria; - approval and escalation gates; - contingency and rollback; - handoff completeness. ## Regression record For material changes, record: | Area | Before | Intended change | Verification | Result | Residual risk | |---|---|---|---|---|---| Do not claim “no regression” when only a subset was tested. State the tested scope.
SHA-256: 92d5d3aac530177d5bb02eeb89152adaac037cb929fb780a04f04f36a4fbbb2a