← Files PE Prep Pro EngineeringARCHIVED FILE
skills/review-engineering-calculations/references/report-schema.md
1.28 KB · Oct 3, 2026 · 06:20 UTC
# Preliminary-review report schema The final report must contain these sections in order: 1. Executive summary: scope, overall result, material limitations, and count by severity. 2. Document and calculation inventory: every reviewed file, sheet, page, equation, and normalized calculation ID. 3. Findings table: ID, severity, exact source location, condition, evidence, independent result, consequence, and recommended verification. 4. Unit and dimensional audit: conversions, inconsistent dimensions, offset-temperature handling, and unitless assumptions. 5. Assumption and dependency gaps: missing loads, boundary conditions, material properties, system states, safety factors, or upstream results. 6. Citation ledger: citation as written, supplied/public source checked, edition, verification status, and exact evidence. Never add a source that was not checked. 7. Items requiring licensed-engineer judgment: governing criteria, model suitability, load path, failure modes, jurisdiction, and acceptability decisions. 8. Sign-off checklist: source completeness, calculations closed, findings resolved, current references confirmed, and responsible engineer review. Use severity values exactly: `critical`, `major`, `minor`, `observation`. Clearly separate demonstrated errors from unresolved questions.
SHA-256: 93238478c0695500cfb0ad81d5d82047c8f8eda31c47101f884bef1cc354c769