← Files MathboxARCHIVED FILE
skills/research-program/references/program-closeout.md
6.12 KB · Oct 3, 2026 · 06:33 UTC
# Program closeout and compact current state Use at a material program or phase boundary, or for an explicit compaction request. A closeout may leave the mathematical goal open. Do not create one merely because a session ended, and do not start new research on a closeout-only request. The result is a checked synthesis and a smaller default handoff, not a replacement for proofs, audits, computations, route records, or ledger events. ## Establish the exact base Read the project authority and edit rules, current goal contract, and current summary. Search the designated history entry point for the program, then open its route index and only the records needed for decisive or conflicting outcomes. With a ledger, use a brief goal handoff and freshness check; inspect full contracts, active review reports, and artifacts for every status used in the synthesis. Record the assessment Git revision or ledger head and the complete pre-existing issue list from `check --summary --full`; the plain summary samples only eight issues. Do not infer proof from a generated label. For a retrospective closeout, record two distinct provenance points: the historical cutoff (date and exact Git revision or ledger event when available) and the migration-time assessment (date and current revision/head). Say whether the cutoff date was recorded, inferred from Git, or unavailable. A first Git appearance is only a bound on when text was present, not proof of when the mathematics was established. If the cutoff cannot be identified, mark it unknown and do not manufacture an as-of verdict. ## Write one durable closeout Place the closeout in the project-designated records area. Give it a stable program/phase identifier and link the exact authoritative artifacts. Use the [small closeout template](../assets/program-closeout.template.md) when it helps; remove empty fields rather than filling them with speculation. State: - original target and whether it was reached, partially advanced, refuted, or remained open at the cutoff, with exact hypotheses, range and then-known evidence/review conditions; - the strongest results supported at the cutoff and their claim IDs, each linked to its proof, source check, or bounded computation rather than reprinting them; - mechanisms closed by the cutoff and their first failed implication, plus the new mathematical input required to reopen any of them; - unresolved dependencies, active route, cheapest discriminating next action, and any conflicting review or stale evidence; - cutoff and assessment identifiers, relevant verification scope, and links to the route index or records that support the synthesis. State the program outcome **as of the historical cutoff** using only evidence then recorded or otherwise provenance-checked. Separately state what the migration-time review establishes now, including later proofs, retractions, reviews, and stale artifacts. A later proof must not retroactively turn an earlier open program into a completed one. For a contemporaneous closeout, identify the cutoff and assessment as the same checkpoint; omit a redundant later-assessment narrative. If a legacy route is mission-relevant but its program membership cannot be established, leave it in a linked unclassified-route inventory with its source span and reason. Do not count it as a route of this program or silently call it failed, successful, or irrelevant. Unknown mission relevance instead follows the reviewed legacy-log quarantine policy in `research-init`. Unclassified is an index-migration state, not a mathematical evidence label. Do not add a claim/evidence/review ledger event solely for a closeout. Record one only when the mathematical state actually changed, under `research-state` rules. A closeout can be a checkpoint rather than a terminal verdict. ## Keep navigation and current state small Keep exactly one designated live dashboard. Replace superseded checkpoint narratives with a concise current result, exact blocker, active route, review conditions, and next decision; link the closeout for prior work. A program summary is historical synthesis, not a second live claims dashboard. Do not copy a route table, full ledger projection, or verification transcript into the live file. For sustained programs, the default history entry point should list programs or phases, not every route. Each entry links a closeout and a route-level index; the latter links immutable route records with one-line outcomes. A program still in progress may have an "opened" entry linking its route index; append a separate closeout entry when a phase ends rather than rewriting that historical entry. The live dashboard, not the history index, says which route is currently active. A small project may retain a flat index. If a program index itself becomes long, partition it by phase or interval and keep a short navigational entry point. Index entries are append-only within their designated file; corrections link new records. Do not silently relocate old entries during ordinary closeout. For an existing flat index, use the reviewed `research-init` migration rather than pretending its history disappeared. If that skill is unavailable, keep the flat index intact and report the migration as pending. Set an advisory project-specific size or repeated-checkpoint trigger for the live view and top-level index. Exceeding it prompts review, not automatic truncation or deletion. Agents should load the current summary and targeted index entries, never every historical program by default. ## Validate the contraction Before replacing old live prose, map each substantive span to the current view, a linked closeout/route record, or an explicitly retained unresolved archive. Reconcile exact claim wording, evidence and review conditions, unresolved questions, and affected pins. Check links and compare the complete ledger issue list with the base; do not repair staleness by refreshing hashes. Run the project's risk-appropriate checks and inspect the full diff. Report what remains open and any history that is only archived pending classification. If a contradiction or protected file cannot be resolved under current authorization, leave that part unchanged and report the decision needed.
SHA-256: 9d6fdd97dd2a01466a5c796e10569d408d825dcce79eef92258e134ea0b337ad