← Files Compound EngineeringARCHIVED FILE

skills/ce-pov/references/method.md

7.23 KB · Oct 3, 2026 · 06:34 UTC

↓ Download file

# Method and Point-of-View Contract

Load this before reasoning about the POV (SKILL.md Phase 2). It defines the Verify and POV steps, the two cross-cutting properties, the grounding gate, and the output contract for each subject shape.

## The four steps

1. **Frame** (Phase 0) — the question, incumbent, horizon, and success criteria are pinned, and the selection escape hatch has fired if the field is unbounded.
2. **Precedent** (Phase 1) — the precedent-&-activity scout has reported whether a prior stance exists. Precedent-aware, not rigidly first: a CVE's urgency can lead, but you still consume precedent before grading.
3. **Verify** (Phase 2) — apply the grounding gate below to the grounded evidence (scout dossiers and bounded inline-read observations).
4. **Point of view** (Phase 3) — emit the contract for the active subject shape below.

## Two cross-cutting properties (not phases)

- **Skeptic stance.** At every step, seek disconfirming evidence and name the real alternatives — including "keep the incumbent" and "do nothing." "No", "Reject", and "Not-our-problem" are first-class outcomes, not failures to complete. Do not let the framing (or, in warm mode, the conversation's momentum) pull the grade upward.
- **Reversibility-tiered effort.** Scale evidence gathering and verification with the cost of being wrong. The intake tier governs research depth; presentation follows the consumer's needs. Preserve material alternatives and the conditions that would change a consequential judgment.

## The grounding gate

The project floor always applies. The external floor applies in full to an external-adoption question. For a document or approach set, it applies only to external claims that materially support the POV's bottom line; when no external claim is load-bearing, no external source is required. A conversation claim (warm mode) never satisfies either floor until a scout or a bounded inline read of the authoritative source corroborated it — it sits in the *conversation hypotheses* bucket, never the *verified facts* bucket.

A call to another function establishes that the call occurs, not how that function behaves. Verify guarantees against the implementation or tests that establish them. When those sources are unavailable, keep the guarantee unknown in the explanation or recommendation. Label inferred purpose where you state it; a later caveat does not make an unsupported claim safe to use.

### External-adoption questions: the two-floor Invalid-Verdict gate

The verdict must clear **two absolute floors**. They are independent: strong external evidence never compensates for a thin project leg, and vice versa. This is a pass/fail checklist, **not** a comparison of leg sizes.

- **Project floor** — PASS requires the verdict to rest on a concrete, *verified* project fact relevant to the decision, in one of these forms: a **named incumbent plus at least one concrete touchpoint** (a `file:line`, dependency, issue, PR, or doc passage from the dossiers or a bounded inline read) for a replace/migrate; the **verified absence of an incumbent plus a concrete integration/fit point** (where it would slot in, the conventions it must match) for a net-new adoption; or a **prior decision** on the question. FAIL means the project was not actually inspected — return **"Hold — insufficient project grounding"** with a numbered list of exactly what to inspect to make the floor passable. Forbidden from Adopt/Reject on a failed project floor, regardless of how strong the external evidence is.
- **External floor** — PASS requires at least one verified external source whose text supports the claim it backs. FAIL (e.g., no research tools were reachable) → return **"Hold — external evidence unavailable"**, not a graded verdict at lowered confidence.

A conversation claim (warm mode) never satisfies a floor until a scout or a bounded inline read of the authoritative source corroborated it — it sits in the *conversation hypotheses* bucket, never the *verified facts* bucket.

### Documents and approach sets: explicit blocker returns

Apply the same project-floor proof standard to a document or approach set, using a concrete verified project fact relevant to the take or choice. If it fails, return **"Blocked — insufficient project grounding"** with a numbered list of exactly what to inspect to make the floor passable. If an external claim is load-bearing but no verified external source supports it, return **"Blocked — external evidence unavailable"** with a numbered list of exactly what evidence would make the floor passable. Do not disguise either failure as a confident bottom line.

## External-adoption verdict contract

Every verdict preserves the grade vocabulary so decisions remain comparable and discoverable in precedent searches.

**Grade** — exactly one of:

- **Adopt** — proven fit for us; use it.
- **Trial** — promising; use on a low-risk slice first; the next step is a scoped spike.
- **Hold** — a complete, valid decision to *wait* (promising but unstable, migration cost exceeds current pain, category moving too fast). "Hold — insufficient project grounding" and "Hold — external evidence unavailable" are the two gate-failure subtypes.
- **Reject** — judged not worth it for us.
- **Not-our-problem** — for an exposure question (CVE / deprecation) that does not reach us — avoids forcing an adopt/reject.

Preserve the grade and its meaning, incumbent or integration point, verified project and external evidence, material conditions, and what would change a consequential verdict. Keep unverified conversation claims distinguishable from evidence. These are content requirements, not mandatory headings or a fixed layout. A recommended next action is useful only when the result calls for one; it is not permission to execute it.

## Document-take contract

A document POV judges its overall direction rather than inventorying findings. Explain the bottom line and the strengths, risks, and verified project facts that determine it. Verify load-bearing external claims and distinguish unverified conversation claims. Applying revisions belongs to the workflow that owns the document, under the follow-up authority gate.

## Approach-set position contract

An approach-set POV judges developed options supplied by the user, conversation, or calling skill. When comparison requires developing concrete solutions beyond their current form, route to `ce-bakeoff`; discovering an open field belongs to `ce-ideate`, and establishing goals or criteria belongs to `ce-brainstorm`. Preserve the reasons, material tradeoffs, evidence, and conditions behind the position.

Choose when evidence provides a real basis. When the options are genuinely viable either way, say **"Either is viable"** and explain the tradeoffs. Never manufacture certainty with a scorecard or a mechanical count of advantages. Proceeding with an approach is a separate action governed by the follow-up authority gate.

## Delivery

Write the chat block through the `ce-noslop` skill.

The skill body owns consumer adaptation. Keep enough cited evidence to assess the judgment, name what remains uncertain, and make any option or requirement identifiers understandable. Do not reproduce research transcripts. Requested artifacts use `references/report.md`; ordinary answers need no artifact or continuation menu.

SHA-256: b0e9893fed277743927263b8bfe0e4ed984718a5b0966ea6009590be4098d304