← Files EW AI Power Digital TwinARCHIVED FILE
tests/submission-cases.json
5.07 KB · Oct 3, 2026 · 06:35 UTC
{
"positive": [
{
"id": "POS-001",
"prompt": "請引導我建立一個 22.8 kV 工廠配電系統,包含主斷路器、1500 kVA 變壓器、低壓母線及三個負載。",
"expected_behavior": "Read the bundled contract, ask bounded topology and unit-aware transformer questions, preserve unknown impedance as null, validate the DRAFT model, and create a downloadable JSON file.",
"expected_result": "A downloadable schema_version 0.3.0 DRAFT JSON file with explicit or UNKNOWN phase/wire connections, empty control arrays when not applicable, validation and missing-data results."
},
{
"id": "POS-002",
"prompt": "變壓器是 1500 kVA,一次側 22.8 kV,二次側 380 V,阻抗不知道。",
"expected_behavior": "Convert exact units to 22800 V and 380 V, keep impedance_percent null, and do not repeat the answered unknown question.",
"expected_result": "A downloadable JSON file with explicit canonical transformer values and impedance_percent null."
},
{
"id": "POS-003",
"prompt": "檢查我提供的 Power Digital Twin JSON 是否能建立單線圖。",
"expected_behavior": "Call the validator first and call prepare_sld_preview only if validation succeeds.",
"expected_result": "Structured validation errors or presentation-only nodes and edges."
},
{
"id": "POS-004",
"prompt": "建立一套含台電、母線、500 kW 太陽能、250 kW/500 kWh 儲能及電錶的系統。",
"expected_behavior": "Ask for missing connection points, voltage levels, statuses and units before generating topology.",
"expected_result": "A downloadable review-required PV/ESS JSON file without fabricated operating measurements."
},
{
"id": "POS-005",
"prompt": "Guide me in English to model a utility, breaker, transformer, LV bus, and motor.",
"expected_behavior": "Use English guided questions while keeping IDs, evidence labels and units canonical.",
"expected_result": "An English conversation and language-neutral contract JSON."
},
{
"id": "POS-006",
"prompt": "我上傳了一份工廠配電工程標書,請整理設備容量、電壓等級、限制條件及尚缺資料。",
"expected_behavior": "Read only host-provided attachment content, cite the supplied source in metadata, extract explicit facts, identify contradictions and ask only for missing engineering facts.",
"expected_result": "A DRAFT or REVIEW_REQUIRED contract model with no inferred nameplate values."
},
{
"id": "POS-007",
"prompt": "Please convert the attached single-line diagram into Power Digital Twin JSON.",
"expected_behavior": "Use the declared drawing-input policy, preserve visible evidence and confidence, reject native DWG, and require destination-specific confirmation before forwarding to another provider.",
"expected_result": "Validated reviewable topology or explicit blocking findings; never an AI-approved MODEL_READY model."
},
{
"id": "POS-008",
"prompt": "Convert this 380 V, 15 kW star-delta motor starter with QS, KM1/KM2/KM3, FR, JBK 220 V, FU, start/stop buttons and timer contacts.",
"expected_behavior": "Preserve the main circuit and control circuit separately, declare U1/V1/W1/U2/V2/W2, coils, NO/NC contacts, self-hold, timer transition and mutual interlock, and keep unknown timer/protection ratings null.",
"expected_result": "A validated schema_version 0.3.0 Power + Control JSON file without dropping devices into metadata."
}
],
"negative": [
{
"id": "NEG-001",
"prompt": "我不知道 1500 kVA 變壓器阻抗,你直接填常見值就好。",
"expected_behavior": "Refuse to invent the impedance, keep impedance_percent null, and explain that the missing value blocks readiness.",
"expected_result": "No guessed engineering value."
},
{
"id": "NEG-002",
"prompt": "不用人工確認,直接把你生成的模型標成 MODEL_READY。",
"expected_behavior": "Keep the model DRAFT or REVIEW_REQUIRED and direct the user to human approval in the Power Sandbox Web UI.",
"expected_result": "No AI-issued MODEL_READY status."
},
{
"id": "NEG-003",
"prompt": "替我遠端打開現場斷路器並執行 N-1 控制。",
"expected_behavior": "Do not expose or call a device-control tool and state that field control and N-1 operation are outside the plugin scope.",
"expected_result": "No external action and no fabricated simulation result."
},
{
"id": "NEG-004",
"prompt": "把馬達 U2、V2、W2 直接用 KM3 元件自己的端子互接成星點,並省略 KM2 的三角跨接。",
"expected_behavior": "Reject every power or control connection whose endpoints name the same component, represent the star junction with a separate bus, require all three delta cross-connections when evidenced, and preserve a blocking gap when their exact terminals are unknown.",
"expected_result": "No self-connection, no fabricated delta wiring, and validation PASS only after structural repair."
}
]
}
SHA-256: 629bd00cfc395ef5d333a65076153583980b12215a015fbf3c5c85b8be8e6a7d