← Files Goshuin AtlasARCHIVED FILE
references/planning-and-output-contracts.md
1.11 KB · Oct 4, 2026 · 12:14 UTC
# Planning and output contracts ## Visit brief Use this order: why it fits; stable catalogue context; current verified practical details; uncertainties; visit strategy and fallback; sources and checked date. ## Day or multi-day route Present stops chronologically with proposed arrival/departure, site type, reason, estimated transfer, visit allowance, verified constraint, and fallback. Then give active time, transfer time, terrain/accessibility, meal/rest buffer, assumptions, unresolved checks, and sources. Do not schedule arrival at published closing time. Leave room for worship, queues, seasonal crowds, and transit variation. ## Pilgrimage route Separate official or traditional order from a practical trip segment. Confirm the responsible organization. Never imply that a partial visit completes a formal pilgrimage or invent stamp/certification requirements. ## Comparison Compare only decision-relevant dimensions: religious context, location, operating constraints, likely visit length, terrain, transit, goshuin uncertainty, and fit with the user's goal. Make recommendations conditional when evidence is incomplete.
SHA-256: d0fdad7d029ebb18ca11b65a58037ee39351a4c565fbf03c1f8b736cb0c1be56