← Files NoteflixARCHIVED FILE

skills/build-review-plan/templates/review-plan.md

2.57 KB · Oct 4, 2026 · 12:21 UTC

↓ Download file

# Review plan

Append a learner-supplied title only when the learner explicitly provided one. Do not infer a subject title from topic labels.

## Main plan

[If a conservative assumption was unavoidable, write one line `Assumption: ...` here before the table. Omit it when inputs are complete.]

| When | Minutes | Focus | Concrete task | Done when |
|---|---:|---|---|---|
| [window] | [duration] | [topic] | [retrieval/correction/re-check] | [observable criterion] |

When the learner supplied topic labels but no study text, use this exact neutral pattern for every topic-work cell, including fallback: `Write [N] statements about [exact topic label] from your course material; check each statement against that material; revise any mismatch.` Done when: `[N] statements have each been checked and any mismatch revised.` Change only `[N]` and `[exact topic label]`. Do not paraphrase the task, use a shorthand task label, combine topics, or substitute a requested definition, mechanism, component, type, condition, example, comparison, “main point,” or “what you know.”

Do not create mixed or all-topic work rows. Use one exact topic label per topic-work row. For a buffer row use exactly: `Reserve this time for delays; if it is not needed, stop.` Done when: `The reserved minutes are not exceeded.`

## Minute arithmetic

- [window]: [block] + [block] + [buffer] = [available minutes]
- Overall: [window total] + [window total] = [total available minutes]

## Buffer

[Reserved time and how to use it]

## Minimum viable fallback

If the first entire learner-supplied availability window is missed (not merely one topic row):

| Remaining window | Minutes | Focus | Concrete task | Done when |
|---|---:|---|---|---|
| [window that still exists] | [duration] | [one exact topic label] | [same exact neutral pattern when no study text was supplied] | [exact neutral done-when pattern] |

- Original total: [all windows] = [total]
- Missed window: [name] = [minutes unavailable]
- Remaining availability: [total] - [missed] = [remaining minutes]
- Fallback: [scheduled blocks] + [unused remaining minutes, if any] = [remaining minutes]

Do not count the missed window as available fallback time.
Do not select a weak topic or an individual task block as the thing that was missed.

## Start now

[When only topic labels were supplied, use exactly: `Write [N] statements about [exact topic label] from your course material; check each statement against that material; revise any mismatch.` Then: `Done when: [N] statements have each been checked and any mismatch revised.`]

SHA-256: b708d4e22f200c93783f9f1a55041926aef92e95e4b31ceced62e87f7a98191d