← Files okrdevARCHIVED FILE
examples/acme-fitness/checkins/2026-Q3/2026-W36.md
5.38 KB · Oct 4, 2026 · 12:30 UTC
--- cycle: 2026-Q3 week: 2026-W36 attendees: [maya, jordan, priya] --- *Last check-in: 2026-W33 (Aug 13). W34 and W35 were skipped — the coach raised it at session start, ran the two-minute catch-up, and this file spans all three weeks.* ## Wins - maya — Ridgeline Strength converted from trial to an annual plan: studio #33. - jordan — every double-charged member refunded within 24 hours of the W34 incident; zero studios churned over it. - priya — no-show rate hit 12.9% last week, the first reading under 13% since the baseline. ## KR confidence | KR | DRI | Prev | Now | Δ | Evidence/note | |----|-----|------|-----|---|---------------| | KR1.1 | maya | 0.6 | 0.6 | → | fourth straight 0.6 — evidence rule invoked; see note below | | KR1.2 | priya | 0.4 | 0.35 | ↓ | second consecutive check-in under 0.5 — decision forced; dropped (Judgment calls) | | KR1.3 | priya | 0.6 | 0.7 | ↑ | reminder nudges shipped W35; 12.9% last week against the 14.2% baseline | | KR2.1 | jordan | 0.9 | 1.0 | ↑ | GA'd 2026-08-14, a day inside the deadline; holds 1.0 until the retro scores it | | KR2.2 | maya | 0.55 | 0.6 | ↑ | 9 of 31 active studios (29%) have taken a class-pack payment; target is 40% | Coach note: KR1.1 has read 0.6 at four straight check-ins — flat confidence is either precision or autopilot, so the evidence rule fired. maya's line: "3 of 9 July trials converted (33% against the 35% target), two August trials at pricing." Evidence supports the number; 0.6 stands. ## What moved Covers 2026-08-14 → 2026-09-03 (three weeks; W34 and W35 were skipped): - PR #58 — class-pack payments GA to all studios, 2026-08-14 (KR: 2.1) - PR #61 — idempotency keys on Stripe webhooks + refund script for 41 double-charged members (KR: emergency — post-hoc review below) - PR #63 — onboarding email copy fixes (maintenance, auto-classified) - PR #64 — no-show reminder nudges: 24h email + 2h SMS (KR: 1.3) - PR #66 — class-pack gifting, from the W29 promoted item (KR: 2.2) - maya — Ridgeline Strength converted to annual; two August trials at pricing (KR: 1.1) - jordan — incident postmortem written and shared with the six affected studios (emergency follow-through) - priya — class-pack refund help-center article shipped; apology emails to all 41 affected members went out 2026-08-19 (KR: 2.2) ## What's blocked - Twilio A2P registration (filed 2026-08-25) still pending — US studios get email-only nudges until it clears, which drags on KR1.3. jordan is watching it; no action available on our side. ## Health metrics | Metric | Red line | Now | OK? | |--------|----------|-----|-----| | Support ticket volume | >25/wk | 23/wk | ⚠ close | | Checkout error rate | >1.5% | 0.6% (5 of 830 attempts) | ✓ | | Member notification unsubscribe rate | >2%/wk | 1.1% | ✓ | Tickets are two off the red line — the class-pack launch bump (billing questions, refund how-tos). Not a breach, but if it crosses 25 the coach proposes pausing the KR2.2 push until it recovers. jordan's and priya's focus items aim squarely at it. Unsubscribes doubled since the SMS nudges went live (0.5 → 1.1) — watched, still comfortably under the line. ## Drift check - PR #65 (studio logo uploads) — substantive, shipped with no `KR:` line. Raised with priya in-session first: it was polish for the gifting page. Retagged `KR: 2.2` in the PR description; no judgment call needed. - Maintenance share since W33: 1 of 6 PRs (17%) — under the 30% prompt line. - Emergencies this cycle: 1 — under the recurrence flag (>2/cycle). ## Judgment calls - 2026-09-03 — priya — KR1.2 dropped. Confidence under 0.5 at two consecutive check-ins (W33: 0.4, W36: 0.35) forced a named decision — re-scope / re-staff / kill / accept-the-miss. Call: kill. The onboarding rebuild lost its capacity to the payments GA and the W34 emergency, and the call playbook holds the median near 6 days without product work. Rebuild rolls to Q4 planning as a candidate; id stays frozen — PR #67 (../../okrs/2026-Q3.md) - 2026-09-03 — jordan — emergency post-hoc for PR #61. Was it an emergency? Yes: 41 members double-charged real money on 2026-08-17. What did it protect? Member trust and the payments launch — refunds out inside 24 hours, zero churn. Root cause: Stripe webhook retries without idempotency keys; the fix is permanent, not a patch. First emergency this cycle — PR #61 ## Parking lot triage - [2026-08-02] AI workout-plan generator — **archive** — fun, serves no current KR; re-park it if a studio asks twice. - [2026-08-19] Dark mode for member app — **archive** — zero studio requests in ten weeks. - [2026-08-27] Zapier integration — **archive** — one request ever; revisit at Q4 planning if it recurs. - [2026-09-01] Demo-data generator for prospect walkthroughs — **side-quest** — box: 4h (maya — within budget; makes every KR1.1 demo cheaper). ## Focus for next week - **maya** — pricing calls with the two August trials (KR1.1); call the eight studios still selling packs off-platform (KR2.2) - **jordan** — kill the top three ticket drivers from the launch bump (KR2.2 + the support-ticket health metric) - **priya** — self-serve refund flow spec with jordan (KR2.2 + health); studio-facing no-show report (KR1.3) *Check-in ran 09:31–09:40 — nine minutes, including the catch-up. The coach pre-drafted everything above except the confidence calls, the KR1.2 decision, and the triage.*
SHA-256: f9c840288bfc4a49634ee2e12afb63518b84327a64aac9a3859845289aa3c930