← Files Intuitive Software DesignARCHIVED FILE
tests/scenarios/03-new-design.md
817 Bytes · Oct 4, 2026 · 12:34 UTC
# Scenario 3 — New Design ## Prompt Use Intuitive Software Design to help design a project-creation feature that does not yet exist for construction project managers. A project needs a name and customer before it can exist; scope and team can be added later. Define the flow, decisions, states, recovery, and measurable acceptance. Do not pretend there is an existing screen to audit. ## Acceptance gates - Classifies the request as DESIGN. - Uses the project manager's mental model rather than a database-record sequence. - Applies the Intuitive Software Loop proactively. - Controls Decision Density and keeps deferred settings discoverable. - Defines applicable empty, pending, success, failure, and recovery states. - Labels proposed behavior as a design hypothesis rather than observed usability evidence.
SHA-256: 2a8a5c3239a31e7fdc134af80df51b57995e9dc2dad00b301b578294769db92f