← VoltformerCONTENT HISTORY

Update to Voltformer

Snapshot Sep 30, 2026 · 23:11 UTC · version 1.0.0

Collection source: not recorded for this historical snapshot.

WHAT CHANGED · RULE-BASED ANALYSIS

First saved snapshot

No earlier snapshot is available to establish a change.

Compare saved observations

Download comparison JSON
Full technical diff · 0 changed fields
Full snapshot data
{
  "name": "voltformer-equipment-selection",
  "description": "Select, compare, size, and screen electrical equipment using Voltformer catalog and country-reference tools. Use for transformer, switchgear, protection, generator, grid-equipment, loss/ROI, material, or electricity-reference requests.",
  "included_files": [],
  "skill_md_contents": "---\nname: voltformer-equipment-selection\ndescription: Select, compare, size, and screen electrical equipment using Voltformer catalog and country-reference tools. Use for transformer, switchgear, protection, generator, grid-equipment, loss/ROI, material, or electricity-reference requests.\n---\n\n# Voltformer equipment selection\n\nGive catalog-backed, preliminary engineering results without inventing specifications or implying approval.\n\n## Workflow\n\n1. Identify the equipment family and the user's required ratings, application, country, connection voltages, phase count, and constraints. Use `getCatalogTaxonomy` or category tools when the family is ambiguous.\n2. Search with the matching `query*` tool, then retrieve candidate details with the corresponding `get*BySlug` tool before comparing or recommending.\n3. Use `calculateTransformerSizing` only for preliminary kVA sizing. If primary voltage, secondary voltage, or phase count is missing, state that catalog matches are withheld and ask for those inputs.\n4. Use `getCompatibleTransformersForSwitchgear` and `validateTransformerCountryCompatibility` as screening tools. If prospective fault current or utility/site data is missing, label that compatibility dimension unknown.\n5. For loss ROI, electricity, and raw-material results, report source dates, units, assumptions, and limitations. Do not present reference values as live supplier offers.\n6. Present a short candidate table, explain why each candidate fits, identify unresolved checks, and offer the next appropriate Voltformer action.\n\n## Invariants\n\n- Use only values returned by Voltformer tools; never fill missing technical fields from general knowledge.\n- Do not claim regulatory compliance, utility acceptance, protection coordination, cable adequacy, final design approval, price availability, or purchase completion.\n- Keep catalog and calculation actions read-only. Obtain explicit user confirmation before invoking any separate tool that creates or overwrites account data.\n\n"
}

SHA-256: 16ad617bbf590b665ece825843b84e3fa8ef746277abf23b3fdf9a140d569000