← ContinuumCONTENT HISTORY

Update to Continuum

Snapshot Sep 30, 2026 · 23:14 UTC · version 0.5.1

Collection source: not recorded for this historical snapshot.

WHAT CHANGED · RULE-BASED ANALYSIS

First saved snapshot

No earlier snapshot is available to establish a change.

Compare saved observations

Download comparison JSON
Full technical diff · 0 changed fields
Full snapshot data
{
  "description": "Use when a plan materially depends on a capability whose accessibility, authorization, suitability, or functioning is genuinely uncertain.",
  "included_files": [],
  "name": "prevol-capacites",
  "skill_md_contents": "---\r\nname: prevol-capacites\r\ndescription: Use when a plan materially depends on a capability whose accessibility, authorization, suitability, or functioning is genuinely uncertain.\n---\r\n# Pré-vol des capacités\r\n\r\n## Fonction\r\nDistinguer ce qui est annoncé de ce qui peut réellement produire l’effet requis maintenant.\r\n\r\n## Procédure\nNe pas refaire le pré-vol d’une capacité déjà utilisée avec succès dans le même contexte sans changement ni signal contraire. La disponibilité d’un pré-vol n’impose pas son usage.\n\nPour chaque capacité critique, qualifier séparément : annoncée, découverte, accessible, autorisée, opérationnelle, compatible et suffisamment vérifiée.\n\r\nRéutiliser une preuve fraîche lorsqu’elle reste applicable. Vérifier plus profondément une capacité critique, incertaine, nouvellement installée, modifiée ou nécessaire à un effet difficilement récupérable.\r\n\r\nEn cas d’échec, déterminer d’abord s’il est transitoire et récupérable avant de déclarer la capacité indisponible ou de changer de voie.\r\n\r\n## Preuve\r\nLe plan ne dépend d’aucune capacité supposée.\n"
}

SHA-256 of public snapshot: 655cc7806051a66ccdbb833da1204dbf2c8b393bf13122b4735cf409eeb4d896