← WSH Risk AssessmentCONTENT HISTORY

Update to WSH Risk Assessment

Snapshot Oct 9, 2026 · 00:06 UTC · version 1.0.0

WHAT CHANGED · RULE-BASED ANALYSIS

Package or technical metadata updated

Discoverability changed from “UNLISTED” to “LISTED”.

Observed in package metadata. These changes alone do not establish a new customer-facing feature.

Discoverability

Before

UNLISTED

After

LISTED

Share url

Before

Not present

After

https://chatgpt.com/plugins/plugins_6a8b0781ab00819195ee67859b81e9aa?open_in_app

Compare saved observations

Download comparison JSON
Full technical diff · 2 changed fields

changed /discoverability

BEFORE
"UNLISTED"
AFTER
"LISTED"

changed /share_url

BEFORE
null
AFTER
"https://chatgpt.com/plugins/plugins_6a8b0781ab00819195ee67859b81e9aa?open_in_app"
Full snapshot data
{
  "canonical_app_id": null,
  "connector_id": null,
  "created_at": "2026-08-23T14:49:32.156192Z",
  "discoverability": "LISTED",
  "id": "plugins_6a8b0781ab00819195ee67859b81e9aa",
  "is_template": false,
  "name": "wsh-risk-assessment",
  "release": {
    "app_ids": [],
    "app_manifest": null,
    "app_templates": [],
    "description": "Create, review, implement, and communicate Singapore WSH risk assessments.",
    "display_name": "WSH Risk Assessment",
    "id": "pluginrel_ac1f9fd2d6cc8191b8fe57f852f7a1ca",
    "interface": {
      "brand_color": null,
      "capabilities": [
        "Interactive",
        "Write"
      ],
      "category": "Productivity",
      "composer_icon_dark_url": null,
      "composer_icon_url": "https://files.openai.com/content?id=file_00000000fe508211bd5274d346ff93b0",
      "default_prompt": "Create a WSH risk assessment for this work activity.",
      "default_prompts": [
        "Create a WSH risk assessment for this work activity.",
        "Review this existing risk assessment and report its gaps.",
        "Turn these risk-control gaps into an implementation plan."
      ],
      "developer_name": "Goh Keng Beng",
      "logo_url": "https://files.openai.com/content?id=file_000000009c7082118e34015d134c054a",
      "logo_url_dark": null,
      "long_description": "Supports distinct workflows for creating risk assessments, independently reviewing existing assessments, planning and verifying corrective controls, and communicating approved risk information to workers.",
      "plugin_category_id": "productivity",
      "privacy_policy_url": null,
      "screenshot_urls": [],
      "short_description": "Create risk assessments",
      "terms_of_service_url": null,
      "website_url": null
    },
    "keywords": [],
    "mcp_servers": [],
    "onboarding_skill_name": null,
    "requires_local_executor": false,
    "skills": [
      {
        "description": "Create a new workplace safety and health risk assessment aligned with Singapore's WSH Risk Management Code of Practice. Use for task decomposition, hazard and consequence identification, existing-control evaluation, 5x5 risk evaluation, additional-control selection, and projected residual risk. Do not use merely to audit an existing RA or track control implementation.",
        "interface": {
          "brand_color": null,
          "default_prompt": null,
          "display_name": "wsh-risk-assessment",
          "icon_large_url": null,
          "icon_small_url": null,
          "iconography": "hierarchy",
          "short_description": "Create a new workplace safety and health risk assessment aligned with Singapore's WSH Risk Management Code of Practice. Use for task decomposition, hazard and consequence identification, existing-control evaluation, 5x5 risk evaluation, additional-control selection, and projected residual risk. Do not use merely to audit an existing RA or track control implementation."
        },
        "name": "wsh-risk-assessment",
        "plugin_release_skill_id": "pluginrsk_6a8d41c22ad4819181f31c5231003296"
      },
      {
        "description": "Independently review an existing Singapore WSH risk assessment for omissions, weak causal wording, unsupported ratings, control gaps, duplication, and optimistic residual risk. Use for audit, challenge, or gap assessment; revise the source table only when requested.",
        "interface": {
          "brand_color": null,
          "default_prompt": null,
          "display_name": "wsh-risk-assessment-review",
          "icon_large_url": null,
          "icon_small_url": null,
          "iconography": "search",
          "short_description": "Independently review an existing Singapore WSH risk assessment for omissions, weak causal wording, unsupported ratings, control gaps, duplication, and optimistic residual risk. Use for audit, challenge, or gap assessment; revise the source table only when requested."
        },
        "name": "wsh-risk-assessment-review",
        "plugin_release_skill_id": "pluginrsk_6a8d41c1b5b08191901e2a72e8c18223"
      },
      {
        "description": "Turn an approved or clearly identified draft WSH risk assessment into audience-appropriate worker briefings, toolbox-talk material, quizzes, or visual-content briefs. Use for communication and comprehension checking, not for creating, approving, or changing risk conclusions.",
        "interface": {
          "brand_color": null,
          "default_prompt": null,
          "display_name": "wsh-risk-communication",
          "icon_large_url": null,
          "icon_small_url": null,
          "iconography": "chat",
          "short_description": "Turn an approved or clearly identified draft WSH risk assessment into audience-appropriate worker briefings, toolbox-talk material, quizzes, or visual-content briefs. Use for communication and comprehension checking, not for creating, approving, or changing risk conclusions."
        },
        "name": "wsh-risk-communication",
        "plugin_release_skill_id": "pluginrsk_6a8d41c1dba481918c32f3685d2927fa"
      },
      {
        "description": "Convert accepted WSH risk-assessment gaps or recommendations into an implementation and effectiveness-verification plan. Use for hierarchy-of-control selection, owners, deadlines, interim protection, evidence, and residual-risk confirmation; do not treat planned controls as implemented.",
        "interface": {
          "brand_color": null,
          "default_prompt": null,
          "display_name": "wsh-risk-control-planning",
          "icon_large_url": null,
          "icon_small_url": null,
          "iconography": "hierarchy",
          "short_description": "Convert accepted WSH risk-assessment gaps or recommendations into an implementation and effectiveness-verification plan. Use for hierarchy-of-control selection, owners, deadlines, interim protection, evidence, and residual-risk confirmation; do not treat planned controls as implemented."
        },
        "name": "wsh-risk-control-planning",
        "plugin_release_skill_id": "pluginrsk_6a8d41c1d2408191ba40192364eca5c5"
      }
    ],
    "version": "1.0.0"
  },
  "scope": "GLOBAL",
  "share_url": "https://chatgpt.com/plugins/plugins_6a8b0781ab00819195ee67859b81e9aa?open_in_app",
  "status": "ENABLED"
}

SHA-256 of public snapshot: 405e7af3cbe023331a659615a64c8acb81dd8631eedf1e3cf1d6c3cbe9439f48